The coastal railway · Drammen to Skien

Vestfoldbanen

Ports, towns and a railway rebuilt in stages. Follow Vestfoldbanen from the narrow-gauge line of 1881–1882 to the double-track projects, changing budgets and signalling decisions that still shape the journey to Skien.

Holmestrand stasjon, 15 October 2017 · Ole Thomas Halvorsen
CC BY-SA 4.0 · Resized and converted to WebP; cropped in the page layout
First sections1881–1882
Electric operation1957
Through corridorDrammen–Skien
Double-track programmeSince 1993
Explore→Railway lines→Vestfoldbanen

Drammen to Skien

A coastal railway
Rebuilt in stages

Vestfoldbanen links the towns south of Drammen with Tønsberg, Sandefjord, Larvik and Grenland. The full Drammen–Skien journey follows a railway opened in 1881–1882, but its tracks, stations and tunnels now span several generations of rebuilding. 01

The modern named line ends at Porsgrunn; the trains' final approach to Skien belongs to Bratsbergbanen. The whole corridor is followed here, including its original branches, occupation history, separate double-track projects, costs, opening problems and the remaining gaps. 01

Drammen–Skien · via Tønsberg and Larvik

The long rebuilding of the coastal railway

01

Choosing the towns along the coast

Parliament approved Drammen–Skien and the Horten branch in 1875. A coastal route prevailed over inland alternatives, joining ports, trading centres and the farmland between them. Construction began in 1876. 02

The line crossed a landscape already shaped by shipping, agriculture and industry. Its stations brought these activities into a new transport network. The later history of Vestfoldbanen has repeatedly returned to the same question: how closely should a faster railway follow the towns it serves? 03

02

The railway reached Larvik before Skien

The ceremonial openings took place on 13 October 1881 to Larvik and 23 November 1882 to Skien. 03

Ordinary traffic began on 7 December 1881 to Larvik and on 24 November 1882 to Skien, following the ceremonies. 02

Built to the Norwegian narrow gauge of 1,067 millimetres, the railway initially belonged to an era of relatively light lines. Drammen–Skiensbanen and Jarlsbergbanen were earlier names; Vestfoldbanen became the established name in 1930. 02

03

Stations, ports and the Tønsberg realignment

Station buildings, goods sheds, sidings and harbour connections made the railway a working part of each town. The surviving buildings also show how much of the original railway was designed as a recognisable public institution. Balthazar Lange's station architecture gave the early line a distinctive character, even where later rebuilding changed the tracks around it. 03 04

Modernisation has often moved the railway away from its first alignment. Reading the corridor today therefore means noticing both the active railway and the older station districts, bridges and formations left within the towns. 37

Through trains originally reversed at Tønsberg. A new alignment and station opened on 1 October 1915, removing the reversal. 02

04

Horten first had a branch into town

Horten's original connection ran from Skoppum into the town. Its two-storey wooden station, completed in 1881, contained waiting rooms, a ticket office and a café, with goods and locomotive facilities alongside. The building was part of the everyday town as well as the railway: a dentist used rooms upstairs for many years. 04

Passenger traffic ended in 1967 and the station was demolished in 1973. The new Horten station planned for 2026 is a station on the main line near Skoppum. It is a different transport solution from the old branch and its central terminus. 04 25

05

Private railways reached inland industry

The coastal railway also connected with smaller inland systems. Tønsberg–Eidsfossbanen opened in 1901, joining the ironworks community at Eidsfoss to Tønsberg. It shared part of its route with Holmestrand–Hvittingfossbanen. Both closed in 1938. 05

Their brief operating lives show the limits of the early railway economy. A connection could be important to a particular factory or district without attracting enough traffic to remain viable. Surviving station and workshop remains at Eidsfoss preserve a part of Vestfold's railway history outside the present main line. 05

06

Standard gauge took years to arrive

Gauge-conversion work began in 1934. 02

The conversion was completed on 3 October 1949. The railway had to keep serving its communities through a long transition interrupted by war. Standard gauge finally removed the incompatibility with the connected national network. 37

The conversion changed the railway's equipment and traffic possibilities while much of its nineteenth-century alignment remained. Later electrification and, eventually, new tunnels addressed different limitations. These were successive rebuilding programmes, rather than one continuous original construction project. 37

07

The occupation joined the railway to a military coast

German forces attacked Karljohansvern at Horten in April 1940. During the occupation the county acquired coastal forts, stores, camps and defensive works. The ammunition establishment at Langgrunn south of Horten formed part of that military landscape. 06

Near Larvik, positions by the mouth of the Lågen protected the approaches to the harbour and nearby road and rail links. The surviving defences show the importance of an existing transport corridor to the occupation authorities. 06

08

Berg and the deportation of November 1942

The railway also served persecution. Early on 26 November 1942 a train carried 227 Jewish men from the Berg internment camp area towards Oslo. Eight were sixteen or younger. They had been imprisoned by Norwegian authorities and were now taken to the ship Donau for deportation. 07

Vestfoldarkivet preserves Moritz Nachtstern's account of the journey and imprisonment. The transport links this railway corridor directly to the Holocaust and to Norwegian participation in the arrests and deportations. It belongs alongside the history of occupation traffic and resistance, with the prisoners' experiences at its centre. 07

09

The railway sabotage of March 1945

On 14 March 1945 resistance groups attacked railway targets across Vestfold as part of Aksjon Betongblanding. The campaign sought to interrupt German transport during the final months of the war. Local accounts describe attacks around Råstad and Sandefjord, including points and the Dølabakken railway bridge. 08

The operation depended on local railway knowledge, coordination and the movement of people and supplies under occupation. Participant testimony records preparations as well as the attacks themselves. The damaged railway was an immediate transport problem for the occupiers and a future repair task for the railway that would serve the country after liberation. 08

10

An electric regional railway

Electric operation began in December 1957. The change completed a major post-war transformation: Vestfoldbanen now had standard gauge and electric traction. It remained a railway through closely spaced towns, with passenger traffic increasingly important to its identity. 01

Electric trains did not remove the sharp curves, level crossings and single-track sections inherited from the old line. As road travel improved, the railway's competitive position depended increasingly on journey times, frequency and reliability. The modernisation that began in the 1990s addressed those constraints on a much larger scale. 12

11

The first double-track projects: Skoger and Sande

The modern double-track programme began in 1993. 12

The new section through Skoger entered service in 1995, separating the faster railway from the old station layout. Skoger station itself was formally closed in 2001. 09

At Sande, construction of the replacement alignment began in 1995 and the new railway opened in 2001. Moving the station changed the town's relationship with the line. These early sections improved individual stretches years before there was a continuous double track towards Tønsberg. 10

Construction history includes procurement as well as engineering. Økokrim's account of unlawful tender cooperation identifies the 1995 Åshaugen culvert contract, part of Vestfoldbanen's modernisation through Sande, among the affected works. Its account also records an accepted penalty and confiscation against Kruse Smith in 2005 within the same case complex. 11

12

Barkåker–Tønsberg opened with a temporary signal solution

Approved in 2008 and begun in 2009, Barkåker–Tønsberg brought a new tunnel beneath Jarlsberg, double track and the removal of twelve level crossings. Traffic began in November 2011. The project combined approximately 5.8 kilometres of new double track with renewal of the approach towards Tønsberg. 12

It was delivered in stages because Jernbaneverket lacked a contract with a signal supplier. A temporary signalling arrangement allowed the first opening, while the full station solution waited. The new railway therefore offered less capacity than its completed physical layout might suggest. 12

13

Holmestrand changed from a surface railway to a mountain station

Holm–Nykirke developed from earlier plans for crossing facilities and staged improvements. A surface station and a railway designed for 200 km/h were considered before the decision to accommodate 250 km/h. That change helped move the chosen railway into the mountain. 13

Vista Analyse's later evaluation questioned the maturity of the decision process and whether the more ambitious solution was justified by its benefits. The mountain route removed the railway from the narrow coastal corridor, but it also made the station a much larger engineering undertaking. 13

14

A station hall with four tracks

The new Holmestrand station sits inside the mountain, with platforms alongside the outer tracks and two central tracks for passing trains. Designing the hall meant addressing sound, air pressure, escape routes and the passage of fast trains as well as the ordinary needs of waiting passengers. 14 15

Construction began in 2010. The station and new double track opened for traffic on 28 November 2016. Access through the mountain and the later lift connection to the plateau gave the station a new relationship with the town above and below the cliff. 16 14

15

Costs and the first years at Holmestrand

The Holmestrand project became more expensive than its management target. Vista Analyse gives a final cost of NOK 6.443 billion in 2019 prices, compared with a price-adjusted original ceiling of NOK 6.9 billion. Its evaluation therefore places the project within the original cost ceiling, despite the growth above the lower target. 13

Government budget papers describe changes to water and frost protection, the station's technical design and the added lift from the plateau. Concrete lining replaced the earlier assumed foam solution. These changes, and the delays in completing the hall, explain more than a comparison of undated headline totals. 15

The Railway Directorate's 2017 annual report records a temporary speed reduction after passengers experienced vibration at high speed. It says normal speed was restored after remedial work. The restriction was an actual early operating problem, rather than proof that the line permanently failed to meet its design speed. 16

The 2017–2018 budget also records a temporary round-the-clock control centre to ensure that lifts, fire doors and other equipment in the mountain worked properly. The railway could be open to passengers while systems around the new station still needed exceptional attention. 15

16

A new route between Larvik and Porsgrunn

Farriseidet–Porsgrunn replaced the winding railway beside Farris and through Bjørkedalen. The new line opened for traffic on 24 September 2018 after a seven-week final connection programme. It shortened the journey between Larvik and Porsgrunn to about twelve minutes. 17

The approximately 23-kilometre project included seven new tunnels and ten bridges. It had originally been conceived as a single-track railway with passing loops, before the decision to build double track. Much of the journey now takes place through rock, rather than following the older terrain around it. 18

17

Farriseidet: a small ceiling overrun and spare capacity

The independent evaluation reports a 2022 final forecast of NOK 7.335 billion and a cost about one per cent above the original approved ceiling. It identifies scope changes, design costs and the close-out phase among the reasons. Traffic began around three months later than the original programme. 18

The evaluation found a substantial journey-time improvement and better local punctuality, but also considerable unused capacity. Single-track sections elsewhere and the absence of the proposed Grenlandsbanen limited what the new double track could deliver as part of the wider network. 18

18

Drammen and Nykirke received separate investment decisions

In 2019 the government proposed a ceiling of NOK 14.645 billion for Drammen–Kobbervikdalen and NOK 7.576 billion for Nykirke–Barkåker, both in 2019 prices. The lower management targets were NOK 12.723 billion and NOK 6.567 billion respectively. A target and a parliamentary ceiling serve different purposes; neither is a final bill. 19

The planned opening dates were December 2025 at Drammen and December 2024 for Nykirke–Barkåker. The latter project also depended on work outside its own contract boundary, including train stabling and power supply, before the full timetable improvement could follow. 19

19

The 2020 funding dispute was also about construction pace

In March 2020 the government reported that signed Vestfold contracts required more expensive work earlier than expected: approximately NOK 1.1 billion more in 2020 and NOK 1.5 billion more in 2021, in 2020 prices. At that point the forecasts remained within the projects' agreed management and cost limits. 20

The report distinguished the changed payment profile on Vestfoldbanen from cost growth on Follobanen and the Moss project, while explaining that all drew on the same constrained railway budget. More money needed in a particular year did not automatically mean the total project had overrun. 20

20

Drammen's tracks, tunnel and station were rebuilt together

Official construction began on 19 December 2019. The project built ten kilometres of new double track, including the tunnel through Strømsåsen, and expanded Drammen station from five tracks to six. The station area was raised forty centimetres to improve resilience to flooding. 21 19

Platforms, track connections, stabling at Sundland and the railway part of the new city bridge all formed part of the wider works. Rebuilding a busy junction required these elements to work together while the existing network continued carrying passengers and freight. 21

21

Drammen opened on 31 August 2025

The rebuilt station and new double track entered service on 31 August 2025. This was the traffic opening; the later official ceremony marked the achievement after trains were already using it. The new layout provided more room for trains and better access to the platforms. 22

The opening came after three additional weeks of replacement buses between Brakerøya and Drammen. Bane NOR's 2025 punctuality report then records start-up failures during September and October. It identifies the more stable period from late autumn as the point when the benefits of the additional capacity became clearer. 23

22

A new relay installation while ERTMS waited

Drammen did not open with ERTMS. Delays to the digital signalling programme led Bane NOR to build a new NSI63 relay installation instead. Around 30,000 wires linked its equipment; refurbished relays were used alongside new components. The alternative allowed the station project to proceed without waiting for the national rollout. 27

In March 2025 Bane NOR estimated that the relay room might remain in service for roughly ten years. That was an estimate, rather than a fixed conversion date. The choice also meant that a newly rebuilt station would later require another signalling transition. 27

23

Nykirke–Barkåker changes the route to Horten

The approximately fourteen-kilometre Nykirke–Barkåker project takes the railway through a new corridor with three new rock tunnels and a new Horten station near Skoppum. It also includes connections to the existing railway and work on Tangentunnelen. The old Skoppum station closed permanently on 12 October 2026. 25 26

The planned traffic opening is 22 November 2026. Bane NOR's October programme sets energisation for 5 November, followed by testing and final preparations. Both dates are still ahead of the October 2026 stage described here; the new railway is not yet an opened section. 26 36

24

ERTMS south of Drammen is a separate change

Bane NOR's published 2026 plan places the new ERTMS section between the exit from Drammen station and the entrance to Sem station. That is different from converting Drammen station itself, and different again from equipping the entire route to Skien. 29

The national programme has been replanned because both trackside systems and compatible trains must be ready. Interim conventional signalling has been necessary on some projects. Readiness of the trains is part of the railway's opening and service plan. 28

25

Cost ceilings and the promised train service

The proposed 2027 budget lists both original and current ceilings in the same price basis. In millions of 2027 kroner, Drammen–Kobbervikdalen is 18,240 against 18,240, and Nykirke–Barkåker is 9,107 against 9,107. These entries do not show an increase above the price-adjusted original ceilings. They are ceilings, not audited final costs. 30

Together, the new sections are designed to provide capacity for four trains an hour each way between Oslo and Tønsberg, but building that capacity does not automatically supply the timetable. Train deliveries, ERTMS equipment, stabling and the service agreement must also be ready. 26 30

The proposed 2027 budget places the full improvement in December 2027, conditional on sufficient trains. It replaces an earlier intention to introduce three trains an hour in autumn 2027 before moving to four in December. The construction opening and the larger passenger service therefore have different dates. 30

26

Tønsberg–Larvik remains the unfinished middle

Between the new northern railway and the Farriseidet section lie Tønsberg, Stokke, Torp, Sandefjord and Larvik. Earlier InterCity plans envisaged continuing double-track construction through this corridor. Route choices, station locations, costs and the order of investment have remained politically contested. 32

Sandefjord adopted its municipal corridor plan in 2019. Land reservations constrained what affected owners could build, and were extended in 2023. The consequences of a railway plan therefore reached residents long before construction: properties and town development could remain on hold while the national timetable changed. 34

27

Stokke–Torp–Sandefjord was still disputed in October 2026

Parliament asked for the Stokke–Torp–Sandefjord project to begin within the first six-year period of NTP 2025–2036. Further planning received funding in the 2025 budget settlement, and Bane NOR was instructed to restart planning in June 2025. Questions in Parliament in 2026 challenged whether the project was again being put aside. 33 34 35

The government's proposed 2027 budget contains no funds for continued planning, according to the county and Sandefjord municipality. In October 2026 the county requested NOK 30 million to keep the planning moving. This is an unresolved budget and planning dispute, not a completed cancellation or a funded construction start. 35 34

28

The old railway south of Tønsberg still needs renewal

In an April 2024 parliamentary answer, the transport minister estimated ERTMS-related work between Stokke and Larvik at NOK 560 million in 2024 prices, including station works and replacing level crossings with separated crossings. Tønsberg belonged to a different package. 31

The same answer cited a then-planned 2030 conversion for Tønsberg–Skien. Subsequent national replanning means that date should be read as the plan reported in 2024, rather than a present guarantee. Existing track, signalling and crossings still need maintenance while larger rebuilding decisions wait. 31 28

29

Porsgrunn and Skien remain part of the through journey

Passenger trains continue beyond the formal Vestfoldbanen boundary at Porsgrunn to Skien on Bratsbergbanen. That final section matters to the Drammen–Skien journey even though it carries another railway name. Grenland's railway also connects with industrial traffic towards Borgestad and Brevik. 01

Farriseidet–Porsgrunn has already changed the southern approach substantially, but it did not create continuous double track all the way to Skien or complete the missing middle farther north. The history of the whole corridor is therefore also the history of the connections between its separate projects. 17 32

30

A railway whose reliability depends on the whole route

Bane NOR's 2024 report traced more than half of Vestfoldbanen's signalling-related delay hours to failures in the Oslo area. Delayed trains then met the constraints of single track farther south, where a missed crossing could disturb other services. Construction at Drammen added its own restrictions before the 2025 opening. 24

The resulting railway has real gains in journey time and capacity, alongside unfinished connections and repeated changes to the promised timetable. Its next chapter depends on bringing track, signals, trains and service commitments into use together, while keeping the older railway dependable for the people who use it every day. 23 32

Continue exploring: Bratsbergbanen · Drammenbanen · Sørlandsbanen.

A railway in dates

The railway through time

Parliament approves the coastal railway

The Drammen–Skien scheme includes the Horten branch. 02

Construction begins

Work starts on the narrow-gauge railway. 02

Drammen–Larvik ceremony

The first part is formally inaugurated. 03

Ordinary traffic to Larvik

The public timetable begins on the first section. 02

Skien is reached

The ceremony is followed by ordinary traffic. 03

Tønsberg–Eidsfoss opens

The private line connects inland industry with the coast. 05

Tønsberg is rebuilt

A new station and alignment remove the reversal. 02

Gauge-conversion work begins

The long transition to standard gauge gets under way. 02

The private inland railways close

Tønsberg–Eidsfoss and Holmestrand–Hvittingfoss cease operation. 05

Occupation

The attack on Horten brings war to the coastal corridor. 06

Deportation from Berg

Jewish prisoners are transported towards Oslo and Donau. 07

Aksjon Betongblanding

Resistance groups attack railway targets in Vestfold. 08

Standard gauge completed

The conversion removes the break with the wider network. 03

Electric trains

Electric operation reaches Vestfoldbanen. 01

Horten passenger traffic ends

The original branch loses its passenger service. 04

Modernisation begins

The staged double-track programme starts. 12

Skoger double track

The first new northern section enters service. 09

The new Sande railway

The replacement route and station open. 10

Barkåker–Tønsberg

Approval is followed by construction. 12

Holm–Nykirke works begin

Construction starts on the mountain railway and station. 14

Barkåker–Tønsberg opens

A temporary signalling solution supports the first stage. 12

Farriseidet construction

The new Larvik–Porsgrunn alignment enters construction. 18

Holmestrand opens

Trains begin using the mountain station and new double track. 16

Remedial work at Holmestrand

Vibration prompts a temporary speed restriction; repairs restore normal speed. 16

Farriseidet–Porsgrunn opens

A much faster railway replaces the old route. 17

New investment decisions

Drammen and Nykirke receive separate cost frameworks. 19

Drammen construction starts

The station and Strømsåsen works enter the main construction phase. 21

A changed funding profile

Contracts require more spending in the first two construction years. 20

Signals farther south

A ministerial answer sets out costs and the then-current ERTMS plan. 31

Stokke–Sandefjord planning restarts

Bane NOR receives a new planning instruction. 34

The new Drammen railway opens

Traffic begins through the rebuilt station and new tunnel. 22

Drammen start-up problems

Failures follow the opening before performance improves later in the year. 23

Skoppum closes

The original station is permanently closed before the new Horten opening. 26

Outer InterCity funding disputed

Vestfold seeks continued planning money in the proposed 2027 budget. 35

Nykirke–Barkåker traffic opening

The announced date remains ahead at the October 2026 stage of the project. 26

Four trains an hour

The proposed service increase depends on available trains and signalling. 30

Sources

Read further

Open each original source, or use Google Translate to read Norwegian pages in English.

Explore the railways

More lines
More history

Follow the railways that connect with this route, or explore another part of Norway's railway history.

See the railway lines