Drammen-Stavanger · 1866 to today
A main line assembled over time
Sørlandsbanen was not laid from one end to the other in a single campaign. Its story begins with local railways built for different districts, then follows the political work of joining them into a through route.
The rails were older than the name
The first part of the future route opened before anyone spoke of Sørlandsbanen. Randsfjordbanen reached from Drammen to Hokksund in 1866, and its narrow-gauge branch to Kongsberg opened in 1871. That older alignment later formed the eastern approach to the railway south. 02 04 05
At the western end, the narrow-gauge Jærbanen opened between Egersund and Stavanger in 1878. In the middle, Setesdalsbanen opened from Kristiansand to Byglandsfjord in 1896. Each railway answered a local transport need long before it became a piece of a national main line. 05 08 09
Not one railway built once, but several railways taught to work as one.
Before the south, it was the west
The project was first called Vestlandsbanen. In the 1880s, planners argued over two broad alternatives: a coastal railway serving the towns directly, or an inland route through Telemark and the interior of Agder. The inland route won support partly because the coastal towns already had strong shipping links, while the interior had far poorer communications. Branch lines could then connect selected coastal towns. 02 05
The name also changed. The poet Vilhelm Krag had helped establish “Sørlandet” as the name of the region and campaigned for the railway to carry it. When Parliament approved the first section in 1908 it was still Vestlandsbanen; by the decision to continue west in 1923, Sørlandsbanen was the established name. 02
Parliament fixed the route twice
The 1908 decision authorised a standard-gauge railway from Kongsberg to Neslandsvatn with a branch to Kragerø. It did not yet settle the entire journey to Stavanger. 01 02 05
In 1923, Parliament approved the continuation from Neslandsvatn through Kristiansand towards Egersund. That decision completed the political map of the through railway. Construction would still take another twenty-one years. 02 05
The railway moved west in chapters
In 1920, new track opened from Kongsberg to Hjuksebø, where trains could continue over the shared Bratsbergbanen alignment to Nordagutu. The railway reached Neslandsvatn and Kragerø in 1927, Nelaug and Arendal in 1935, and Kristiansand in 1938. 01 02 04
Each temporary end point changed the travel chain. Long-distance trains were extended as the railway advanced, while branches to Kragerø and Arendal connected the inland main line back to the coast. The complete route to Stavanger did not open until 1944. 01 02
At Grovane, two gauges met
Setesdalsbanen had opened in 1896 as a 78.3-kilometre narrow-gauge railway from Kristiansand to Byglandsfjord. Its traffic included timber, wood products and other goods from the valley, with steamships carrying the transport chain farther north from Byglandsfjord. 08
When standard-gauge Sørlandsbanen reached Kristiansand in 1938, the southern part of Setesdalsbanen was displaced and Grovane became the new transfer station. Passengers and goods continuing into Setesdal had to move between the 1,435-millimetre main line and the 1,067-millimetre valley railway. The surviving museum railway preserves part of that older system today. 05 08
The railway of bridges
Sørlandsbanen cuts across valleys, rivers and waterways more often than Norway's other main lines. The Norwegian Railway Directorate counts 496 bridges between Drammen and Stavanger. 03
The structures also reveal the railway's age in layers. Stone arches dominate much of the older eastern section. Large steel bridges are characteristic between Neslandsvatn and Kristiansand, while concrete is more prominent farther west. The result is not one engineering style, but a built record of different periods and materials. 03
Two tunnels, one narrow opening to daylight
West of Kristiansand, the railway repeatedly leaves one valley by tunnel and emerges into the next. The two longest meet the short open section at Snartemo: Hægebostadtunnelen approaches from the east at 8,474 metres, and Kvinesheitunnelen continues west for 9,065 metres. 02 06 07
Kvinesheitunnelen was completed in 1942 and remained Norway's longest railway tunnel until Lieråsen opened in 1973. Hægebostadtunnelen opened in 1943 as the railway advanced to Moi. A memorial at Snartemo records the 24 people killed in accidents during the railway works from 1934 to 1944. 06 07

The final link was completed under occupation
The project did not begin with the invasion. Parliament had approved the continuation in 1923, construction was already under way, and trains had reached Kristiansand in 1938. After the occupation, however, the German military command made completion of the Oslo-Stavanger connection its first railway-building priority in southern Norway. With NSB as construction manager, 4,200 people were working on the line in summer 1941; Norwegian and German private contractors were also brought in. 02 12
The decisive missing link was the tunnel-rich railway from Kristiansand to Sira. Much of the work had begun before the occupation, but the wartime programme forced the unfinished route into service, including Kvineshei and Hægebostad tunnels. 02 06 07
In 1944, the new connection and the provisional standard-gauge conversion of the 75-kilometre Jærbanen created continuous operation to Stavanger. The opening did not mean every western work was finished to its final standard. Major improvements west of Sira continued until 1953, and between Sira and Ogna the resulting line was in practice largely new. 02 09 12
This part of Sørlandsbanen's history involved NSB-led construction and Norwegian and German contractors. It is separate from the history of prisoner labour on the northern railway projects, which belongs to Nordlandsbanen. 12
Electric operation came in stages
The long tunnels made smoke from steam locomotives a practical problem. Electric operation on the Marnardal-Sira tunnel section was therefore prioritised and introduced in 1944. The wires reached Kristiansand from the east in 1949. 02 04
The full route did not become electric at once. Official Railway Directorate sources place completion to Stavanger in 1956. That is the date used here. 01 02
A long main line, still mostly single track
The modern overview describes a 549.0-kilometre electrified railway between Drammen and Stavanger, with 45 passenger stations and stops. Most of it is single track; the Sandnes-Stavanger section gained double track in 2009. 01
The railway runs west through Kongsberg and Telemark, reaches Kristiansand, crosses the tunnel-rich western section and continues over the rebuilt former Jærbanen to Stavanger. Its route carries traces of every railway and construction period gathered into the present line. 01 02
An Oslo-Bergen train uses Sørlandsbanen only from Gulskogen through Mjøndalen and Steinberg to Hokksund, where it turns north onto Randsfjordbanen. That overlap is a small part of Sørlandsbanen, not the definition of it.
The whole line in time
From separate lines to a southern main line
Rails reach Hokksund
The Drammen-Hokksund section opens as part of the original narrow-gauge Randsfjordbanen.
The branch to Kongsberg
A new narrow-gauge branch from Hokksund creates the eastern base of the later route south.
Jærbanen opens
The narrow-gauge railway between Egersund and Stavanger begins operation at the opposite end of the future main line.
Setesdalsbanen
The narrow-gauge Kristiansand-Byglandsfjord railway opens through the Otra valley.
Vestlandsbanen approved
Parliament authorises the route from Kongsberg to Neslandsvatn and a branch to Kragerø.
Standard gauge to Kongsberg
Randsfjordbanen and its Kongsberg branch are converted for the new national main-line network.
The new line reaches Hjuksebø
The Kongsberg-Hjuksebø section opens; trains continue over shared Bratsbergbanen track to Nordagutu.
The route west is fixed
Parliament approves the continuation from Neslandsvatn through Kristiansand towards Egersund.
Neslandsvatn and Kragerø
The railway advances through Telemark and reaches the coast by branch line.
Nelaug and Arendal
Sørlandsbanen meets the older Arendal railway, which is converted to standard gauge for the connection.
Kristiansand
The railway reaches Kristiansand; Grovane becomes the transfer point to narrow-gauge Setesdalsbanen.
A wartime construction priority
With NSB as construction manager, 4,200 people are working on the western completion project during the summer.
Kvinesheitunnelen
The 9,065-metre tunnel is completed west of Snartemo.
The railway reaches Moi
Hægebostadtunnelen opens with the extension through the western valleys.
A continuous route
Through standard-gauge operation reaches Stavanger after the accelerated wartime works and conversion of Jærbanen.
Electric to Kristiansand
Electric operation from the east reaches Kristiansand on 1 June.
Western rebuilding complete
The last major realignments of the former narrow-gauge route west of Sira are finished.
Fully electric
Electric operation is complete all the way to Stavanger.
Double track on Nord-Jæren
The new double-track section between Sandnes and Stavanger opens.
Sources
The long railway to Stavanger
Open each original source, or use Google Translate to read Norwegian pages in English.