The valley railway built for power
The valley first looked towards Bergen
After the railway reached Kongsberg in 1871, Numedal began seeking its own line. Representatives of Flesberg, Rollag and Nore met at Nordre Tråen in August 1873, hoping their valley might become part of the route to Bergen. 02 03
Local hopes survived the choice of Hallingdal for Bergensbanen. Later proposals envisaged extending a Numedal line to Geilo. That connection was never built, leaving the railway dependent on traffic generated within its own valley. 08
Hydroelectricity changed the argument
The state acquired Nore's waterfalls in 1907. Tunhovdfjorden's regulation was approved in 1915; its dam was completed in 1920. The power station's turbines and generators required heavy transport into the valley. 05
The railway became part of a much larger public undertaking. Nore I would supply ordinary electricity consumers, including Oslo, through long-distance transmission. Rails carried the machinery into Numedal; power lines carried the resulting electricity out. 06
The rails reached Rødberg before the opening
Construction access advanced in stages: Kongsberg–Bakkerud was in use in autumn 1924, Bakkerud–Veggli in 1925 and Veggli–Rødberg in 1926. The railway therefore began doing its intended work before the royal opening of the completed public line. 03
Numedalsbanen was built as a light standard-gauge railway. Bane NOR's heritage plan places it among the later NSB branches: modestly equipped lines intended to bring districts into the wider network, rather than competing with the trunk routes for speed or capacity. 08
A royal opening beside the power station
King Haakon VII opened Numedalsbanen on 19 November 1927. Ordinary public service began the following day. The terminus at Rødberg stood beside Nore I, and rails continued directly into the power-station hall so that heavy components could be delivered where they were needed. 04 05
First-year traffic amounted to 11,150 tonnes, or 4,300 wagonloads. About half went to the Nore construction works. 04
A new town grew around the construction works
At the beginning of the 1920s about 1,300 people were attached to the Nore development, most of them newcomers. Rødberg needed houses, shops, schools, roads and a hospital. A place previously consisting of only a few farms became a construction settlement and then a power-station town. 07
Nore I's first generating units entered service in 1928. Its purpose reached well beyond the valley: the railway had helped create an installation tied to the growth of electricity supply across south-eastern Norway. Rødberg's station and power station belong to the same history. 06 07
Modest stations and an unusually complete railway
Stations combined neo-Baroque and neoclassical details with modest railway buildings. Several reused construction huts. Veggli became a station type used elsewhere on NSB, while Rødberg had the most extensive group. 08
Much of the value lies between the stations. Tracks, bridges, signals, platforms, small huts and surviving telegraph equipment together preserve how an interwar branch worked. The protection order later treated the railway as a connected whole rather than a collection of attractive station buildings. 19
Railcars carried the ordinary journeys
Steam locomotives worked construction traffic and the first passenger services. Some trains combined passengers with goods wagons, stopping to shunt freight along the way. Petrol railcars appeared in the 1930s; later lightweight railbuses and diesel railcars became familiar on the branch. 03
The railway's importance did not end with heavy machinery. Passenger trains, parcels, timber and goods connected settlements that had previously depended on much slower journeys. Bane NOR's heritage assessment preserves this everyday branch-line character alongside the industrial story at Rødberg. 08
The railway became part of the retreat in April 1940
The invasion brought deliberate breaks in the railway. Local reports reproduced by historian Dag Kristoffersen record that all available rolling stock was moved to Rødberg on 14 April 1940. Bruhaug's combined road-and-rail bridge was demolished on 15 April and Kjøme railway bridge on 16 April. 09
The demolished crossings interrupted the twelve-year-old railway during Norway's military campaign against the invasion. 09
Bombs damaged the station and the surrounding farms
On 25 April 1940 German aircraft bombed the Veggli area. The contemporary account records damage to the station building, railway wagons and track, as well as houses and farm buildings. Residents fled towards the summer farms in the hills. 09
Children who had been sheltered at the county school were later taken to Djupdal station for transport back towards Kongsberg. The railway appears in these records both as a military target and as a means of moving civilians through a district disrupted by the invasion. 09
Power production continued under occupation
Nore's development did not stop in 1940. As electricity demand increased, further generating units were commissioned in 1942 and 1943, following an earlier expansion in 1939. The power station that had justified the railway remained an important industrial installation through the occupation. 05
Expansion continued after liberation. Nore II began generating in 1946, using the existing power-transmission network. The protected railway inventory records a siding to Nore II near Gvammen: Numedalsbanen served a power complex that developed beyond its original Rødberg terminus. 06 22
Resistance organisation in the final months of occupation
In autumn 1944 Arne Kjelstrup was assigned to Operation Sunshine. He led its Starlight section, covering Kongsberg and Numedal. The Norwegian Industrial Workers Museum traces this work as part of the organisation of local resistance in the final months of the occupation. 10
Kjelstrup had been part of Grouse in 1942 and the covering party during Gunnerside in 1943. He subsequently helped build resistance groups around Hardangervidda before returning to Britain. Starlight placed a veteran of those operations in charge of organising the Kongsberg and Numedal district. 10
The final regular steam workings
Numedalsbanen retained steam traction unusually late. Riksantikvaren records the final regular steam trains between Kongsberg and Svene in autumn 1970, identifying the branch as the last Norwegian line with regular steam operation. 02
Passenger railcars and freight services continued into the diesel era. Old track and station buildings survived alongside newer rolling stock. 01 08
New Year's Eve was the last passenger day
The last ordinary passenger train ran on 31 December 1988. Passenger service was withdrawn from 1 January 1989. The original Kongsberg–Rødberg passenger railway had lasted just over sixty-one years. 11
Closure did not give every part of Numedalsbanen the same future. Freight remained on the lower railway, while the upper valley lost its regular train service. Later plans for heritage use, new freight and alternative land use consequently concerned different stretches of the former route. 01 12
Freight gave the lower railway another life
Svene quarry and the timber industry at Flesberg kept the southern section useful after passenger trains disappeared. The railway's present traffic is timber and wood products, with loads moving from Flesberg towards customers principally in Sweden. 01 20
At Flesberg, the terminal occupies the former station area and Moelven Numedal also has a rail connection. This is a working industrial railway connected to Sørlandsbanen at Kongsberg, with a different purpose and operating area from the preserved railway farther north. 20 21
A derailment exposed the need for rebuilding
Freight traffic revived in 2013, but a derailment in 2014 revealed the poor condition of the sleepers. Norsk Jernbaneklubb records that traffic resumed in 2016 after replacement of all sleepers on the lower section. The investment restored the railway's usefulness to the timber industry. 11
The renewal covered roughly thirty kilometres between Kongsberg and Flesberg. It did not reopen passenger service to Rødberg or restore the entire branch. That distinction explains how a line often described as closed can still carry substantial industrial traffic at its southern end. 11
The Kongsberg connection was rebuilt in 2023
Work completed in 2023 changed the connection with the main line. As part of the Kongsberg stabling project, Bane NOR rebuilt the signalling at the station, automated five level crossings on Numedalsbanen and altered Flesberg timber terminal to speed up loading. 14
The station project began construction in July 2022 and was ready for the December 2023 timetable. Its value to Numedal was practical: freight gained a more effective route into and out of the branch and an improved terminal at the other end of the working section. 14 01
The railway north of Flesberg left the national network
The 2023–2024 state budget set out the decision to remove the approximately 62 kilometres from Flesberg to Rødberg from the national railway network. Bane NOR had concluded that there was no commercial basis for ordinary trains, additional timber terminals or other rail freight north of Flesberg. The Railway Directorate and Ministry of Transport agreed. 12
Removal from the national network opened the way to other land uses. It did not revoke the legal protection of Rollag–Rødberg. Present-day descriptions therefore need to distinguish the working Kongsberg–Flesberg siding, the disused railway beyond it and the separately protected cultural monument in the upper valley. 12 13
Protection extended far beyond the station buildings
Riksantikvaren signed the protection order on 12 September 2013; it took effect on 27 September. The protected stretch runs from the southern approach to Rollag at kilometre 147.05 to the railway's end at Rødberg at kilometre 192.34. 19
Protection covers the formation, rails, sleepers, points, turntable, bridges, tunnels and fixed installations, together with state-owned building exteriors. Its purpose is to retain a complete example of the inland NSB branches built in the 1920s. 19
Protection could not prevent years of decay
By 2025 local and county authorities were raising serious concerns about maintenance. Buskerud's account of a meeting with Bane NOR describes fencing, damaged infrastructure, deteriorating buildings and sections unsuitable for visitor draisines. Officials and the mayors of Rollag and Nore og Uvdal pressed for both immediate repairs and a sustained management programme. 16
In March 2026 Riksantikvaren revoked protection for five structures whose heritage value had been lost through severe deterioration, including Eidsstryken station. Bane NOR had sought removal of nine; four were retained. The decision left the rest of the railway protected and reiterated the public owner's responsibility to maintain it. 15
A road proposal may break the old route
The county's plan for a new alignment of road 40 at Aslefet proposes a road at ground level rather than a replacement bridge over Numedalsbanen. Its project description explicitly says that this would create a break in the former railway. 13
The plan lies outside the protected Rollag–Rødberg section. It shows the practical consequences of withdrawing the northern line from the national network: retaining a continuous historical railway is no longer automatically the starting point for every subsequent transport project. The road scheme remains a plan, rather than a completed severance. 13
A surviving railway with several different futures
Draisine hire at Veggli gives visitors a way to experience part of the preserved line. In October 2026, SvingOm describes an eighteen-kilometre route to Norefjord and says the continuation to Rødberg is closed because of a landslide. The operator's current information is the place to confirm the available route and booking arrangements. 18
Preparations for the 2027 centenary have also brought new investment in interpretation and local use. In June 2026 Buskerud announced grants of 500,000 and 400,000 kroner towards the anniversary project. The line now combines a working freight connection in the south with a protected railway landscape whose future depends on maintenance, local participation and viable uses. 17 16
Continue exploring: Sørlandsbanen · Randsfjordbanen · Railway heritage.
A railway in dates
The railway through time
The railway reaches Kongsberg
The opening to Kongsberg gives Numedal a railway connection to seek further north. 02
The valley organises
Representatives meet at Nordre Tråen to discuss a railway through Numedal. 03
The state acquires Norefallene
The waterfalls are acquired for a future public power development. 05
Tunhovdfjorden regulation approved
Parliament approves an eighteen-metre regulation of the reservoir. 05
Numedalsbanen is approved
The railway is authorised in connection with the Nore power development. 02
The power-station works begin
Construction of Nore I starts as the Tunhovd dam is completed. 05
Rails reach Bakkerud
The first construction section from Kongsberg is brought into use. 03
Veggli is reached
Construction access extends north from Bakkerud. 03
Rødberg is reached
The northern section is available before the formal opening. 03
The royal opening
King Haakon VII opens the completed railway. 04
Public service begins
Ordinary traffic starts on the day following the ceremony. 04
Nore I enters service
The first generating units begin producing electricity. 05
Railcars arrive
Petrol railcars begin carrying passenger traffic. 03
Retreat and demolished bridges
Rolling stock is moved north and the Bruhaug and Kjøme crossings are demolished. 09
Veggli is bombed
The air raid damages the station, wagons and nearby properties. 09
Nore expands during the occupation
Additional generating units are commissioned. 05
Starlight covers Numedal
Arne Kjelstrup takes charge of Sunshine’s Kongsberg and Numedal section. 10
Regular steam ends
The final regular steam services run between Kongsberg and Svene. 02
The last passenger train
Ordinary passenger services end. 11
Freight returns to Flesberg
Renewed timber traffic gives the lower line another purpose. 11
A protection order is signed
Rollag–Rødberg is protected as a complete railway monument; the order takes effect on 27 September. 19
The lower track is renewed
Following a derailment, sleeper replacement allows freight traffic to resume. 11
Maintenance becomes a political issue
Local authorities press Bane NOR over the condition of the protected railway. 16
Five structures lose protection
Riksantikvaren announces a limited revocation after severe deterioration. 15
Centenary grants are announced
Buskerud awards a combined 900,000 kroner towards the 2027 anniversary project. 17