Hell–Riksgrensen · onward to Storlien
The railway across the border
The route east was a choice
The connection was planned as part of a railway between Sundsvall and Trondheim. At a railway meeting in Sundsvall in 1869, Trondheim was invited to take part in the discussion. Meråker was one of several possible routes: alternatives through Verdal and Røros were also considered. Each would have served a different set of Norwegian districts and trading interests. 05
Transporting Swedish timber towards Norwegian ports was a central argument for the eastern connection. Trondheim's municipal authorities, private investors and the two countries' national institutions became involved in its financing. 05
Parliament approved the standard-gauge railway towards Sweden in 1873. 02
The disputed route through Stjørdalen
Choosing Meråker did not settle the route through Stjørdalen. Hans Olav Løkken's historical study describes local landowners promoting a northern alignment from Hell across Langøra and Stjørdalselva to Halsen, then east towards Hegra. It would bring the railway nearer their businesses; one proposal included a siding to the distillery at Bye. Trondheim's interests favoured the southern bank, partly because a new port at Halsen could compete for Swedish trade. 16
The southern route prevailed in Parliament on 24 April 1877. The decision helped determine which settlements gained stations and which were bypassed. The original railway therefore records a contest over ports, land and commerce as well as the engineering problem of reaching Sweden. 16
Construction began beside the fjord
The first ceremonial blast at Hommelvik was fired on 11 November 1875, in the presence of railway director Carl Abraham Pihl and parliamentary president Johan Sverdrup. The harbour supplied the construction site. Locomotives arrived by sea in parts and were assembled locally; a temporary locomotive shed was already needed in 1877. The railway's first infrastructure included the facilities that allowed construction trains to work, long before there was a complete passenger route. 04
Steam operation also needed a dependable water supply. A dam was built above Hommelvik in the 1870s, with a pipe running down to a railway water tower. The work therefore extended into the surrounding landscape as well as along the track. The old supply was replaced by a higher intake in 1928, when greater pressure and cleaner drinking water were required. 06
The railway ran before the royal ceremony
Work advanced in several sections, from the Trondheim approaches through Stjørdalen and Meråker to the border. The upper section towards Storlien presented the strongest climb. Local railway history records a workforce approaching two thousand at its busiest point in 1877. The line was the product of years of simultaneous work on separate construction fronts, rather than a single track gang steadily moving east. 05
The complete route was taken into use on 17 October 1881. King Oscar II's ceremonial opening followed on 22 July 1882, after trains had been running for nine months. 04 03
Trondheim gained a station beside its harbour
Trondheim–Størenbanen joined Meråkerbanen at Brattøra in 1884. Their gauges differed until 1921. 02
The eastern city districts changed around the new line. As housing, workshops and industry expanded at Lademoen, a further station was added. Its building was designed in 1903 by Paul Armin Due. Bane NOR's restoration of the timber Art Nouveau building in 2023 recovered a visible part of the railway's urban history, far from the mountain border most often associated with the name Meråkerbanen. 07
Timber moved west to the ships
Hommelvik became an outlet for timber from Jämtland. The Scottish timber merchant Lewis Miller acquired Swedish forest resources before the railway was finished, then sent the sawn timber to his quay at Hommelvik for shipment to Britain. The railway linked inland forests, sidings, storage grounds and ships in one export chain. Railway-owned quays expanded as the traffic grew. 08
That dependence on trade also made the town vulnerable to its decline. After the First World War, shrinking Swedish traffic and industrial difficulties brought unemployment. When Meraker Brug planned to close its Hommelvik sawmill, workers formed AS Hommelvik Bruk in 1930 and continued operations with loan finance guaranteed by Malvik municipality. The railway's economic history is also the history of people trying to keep the work around it alive. 08
The valley acquired railway buildings and industrial neighbours
Peter A. Blix designed Meråker station and Tevldalen's keeper's house. 02
Kopperå station opened in 1899. The present station building followed in 1918, designed by NSB's architectural office through Baastad and Hoel. Bane NOR places the station 88.3 kilometres from Trondheim and 328 metres above sea level. Even before the final approach to the border, the railway has climbed from its lowland junction into an upland station landscape. 09
The railway helped create an industrial community
Kopperå shows what access to the line could make possible. Meråker-Musea identifies the railway as a decisive reason why Ola Haugan established carbide production there around 1900. An industrial settlement developed beside the works, with a school, shop, post office, railway station, meeting hall, infirmary and church. Rail transport and local power resources gave an isolated site access to wider markets. The former Kopperå I power station now houses the industrial museum, preserving the story of the community that grew around this traffic. 17
The railway became a local employer
The station was a substantial workplace in its own right. Leif Fredriksen's history of Hommelvik describes a staff of railwaymen, cleaners and station management in a town where many other jobs were seasonal or uncertain. Regular railway pay gave its employees a different degree of security from casual dock and industrial work. The stationmaster handled accounts and wages as well as taking shifts in traffic management. 13
The physical work was close to the track. At Hommelvik, staff set points by hand and went out with flags or lamps when a train approached. The railway could carry goods across a national frontier, but its daily operation still depended on people walking between the office, the points and the signal positions in all weather. 13
The link to Stockholm became a year-round concern
Trondheim's commercial association had helped finance Meråkerbanen and campaigned for a better harbour at Brattøra. Its interest in the route continued long after construction. In 1930 it began pressing for the summer-only midday trains to run throughout the year. Its own history records success in 1933, securing the direct connection with Stockholm. For the city's businesses, the cross-border railway needed dependable services as well as tracks: a seasonal timetable limited the connection they had invested in. 25
A route for the occupying army through Sweden
In June 1940, German transport trains from Norway began crossing at Storlien for the journey through Sweden towards Narvik. The Swedish border controller's report for 29 June recorded 160 field-equipped soldiers, two officers, 102 horses, field kitchens and weapons on one train. After the horses had been watered, it continued towards Östersund. 18
Sweden's agreement of 8 July permitted military personnel and war supplies on this corridor. Known as the horseshoe traffic because of its shape, the route connected Trondheim and Narvik by leaving occupied Norway, crossing neutral Sweden and entering Norway again on Ofotbanen. 19
The Hommelvik collision in 1940
On 19 November 1940, a train carrying workers towards the German expansion of Værnes airport collided with a local train from Kopperå near Hommelvik. The accident killed 22 people. Blackout conditions restricted visibility, while the demands of wartime traffic pressed on the railway. The local train linked settlements along the eastern line with Trondheim; the losses reached back into the Meråker communities from which its passengers had travelled. 14
Hommelvik lies on the section now assigned to Nordlandsbanen, but in 1940 it was part of Meråkerbanen. The accident therefore belongs to the historical route without changing the boundary of today's line. It also makes the wartime chapter a story of ordinary passenger journeys and work travel caught inside the occupation's transport system. 01 14
Railway workers helped refugees escape
Conductor Arvid Knudsen worked the Trondheim–Storlien route and became involved in resistance from 1940. Historian John Atle Krogstad describes his intelligence work, distribution of illegal material and help to refugees hidden in railway wagons. On 20 January 1943 he helped Marie Leirfall and her two daughters into a goods wagon at Hegra so that they could reach Sweden. Their escape gives a specific place and family to the railway's role as a route out of occupied Norway. 20
Knudsen was later arrested and was executed at Kristiansten fortress on 19 May 1943. Fanger.no records his imprisonment at Vollan and Falstad before his death. His work on a passenger and freight railway had placed him inside a resistance network with consequences far beyond the station platform. 21
The wider networks drew on the railway workshops and locomotive depot at Marienborg. The Thingstad and Wærdahl groups used workplace and voluntary associations to organise couriers and help people escape. An account published by Jernbaneverket connects this resistance with the same line carrying German war supplies from Trondheim through Sweden to Narvik. 22
The unfinished attempt to bypass Trondheim
The western end of historical Meråkerbanen also exposed a weakness in the occupying army's transport system. Traffic through Trondheim depended on the harbour approaches and their bridges. German commanders feared bombing or sabotage could sever the connection, so the older Norwegian proposal for a line from Stavne to Leangen was revived. Work began in 1943, but the difficult clay beneath the western approach to Tyholttunnelen made progress slow. 24
A second attempt laid railway track through the city streets from Skansen towards Lademoen, where it was to join Meråkerbanen. Local people called it Tilbaketoget, the retreat train. By the German surrender in May 1945 the street track had reached only Søndre gate; neither alternative was complete. The Stavne–Leangen connection finally opened in 1957. Its wartime origins belong to the wider Meråker story even though Leangen is now on Nordlandsbanen. 24
The railway brought survivors home
Railway worker Harald Ludvik Rusten was arrested on 20 October 1943 after taking part in the Wærdahl resistance network. His prisoner record traces imprisonment at Vollan and Falstad, followed by Natzweiler, Dachau and Neuengamme. He survived and returned to Trondheim on 27 May 1945. His daughter's study identifies a passport stamp at Storlien that day and the journey home on Meråkerbanen. The line used for military transit had also become a route home for a surviving railway resistance worker. 23 26
The wires stopped at the border for eighty years
Sweden completed electrification of Mittbanan to Storlien and the Norwegian border in 1945. The Norwegian side remained without overhead power. Through trains consequently needed a change of locomotive at Storlien; in more recent years passengers changed trains there instead. The last through night train between Trondheim and Stockholm ran in 2000. 10
Cross-border electric operation was repeatedly requested from the Swedish side, but the Norwegian section remained outside earlier electrification priorities. Parliament decided in 2014 that Meråkerbanen should be electrified, and work began in 2017. The reasons included international passenger and freight traffic, as well as the value of a usable alternative route between the two countries. 10
The old railway had to make room for overhead power
Electrification involved more than putting a wire above the existing track. Bridges over the railway had to provide clearance for the new equipment, while foundations, masts and power-supply installations were built along the corridor. The Hell converter station was completed in spring 2024. The wider project also covered the Trondheim–Stjørdal section of Nordlandsbanen and the Stavne–Leangen connection in Trondheim. 11
Meråkerbanen's electrical installation was energised in November 2025. Bane NOR records the first electric trains on Meråkerbanen in May 2026. 11
Electric passenger trains were crossing the border by the time the Railway Directorate reported on the opening that June. 10
A border railway with passenger and freight roles
The passenger route continues to connect Trondheim with Storlien, calling along the fjord and then in Stjørdalen and Meråker. Bane NOR lists it as R71, operated by SJ Norge. Hegra, Gudå, Meråker and Kopperå place the present-day border railway within the communities it serves, while Storlien connects the journey with Sweden. 12
The corridor remains exposed to the landscape. Bane NOR's review of 2025 records lengthy closures caused by landslide risk, a further landslide in November and a summer closure during conditions that threatened track buckling. Electrification changes the trains the route can carry; maintaining a reliable railway through the valley and towards the border remains a separate, continuing task. 15
Continue exploring: Nordlandsbanen · Trondheim–Bodø · Dovrebanen · Eidsvoll–Trondheim · Norway's railway story.
A railway in dates
The railway through time
The Sundsvall connection is discussed
Trondheim is invited to join discussions about a railway across the border. 05
Parliament approves Meråkerbanen
Parliament approves the railway. 02
Work begins at Hommelvik
The first ceremonial blast marks the construction start beside the fjord. 04
Construction locomotives arrive
Locomotives brought by sea are assembled for use on the works. 04
The southern bank is chosen
Parliament settles the Stjørdalen alignment in favour of the southern side of the river. 16
The royal opening
King Oscar II ceremonially opens Meråkerbanen. 03
A common station at Brattøra
The southern railway joins Meråkerbanen at Trondheim's harbour-side station. 03
Kopperå station opens
The industrial settlement gains its railway station. 09
Industrial Kopperå develops
Carbide production begins at a site whose railway access helped make the works possible. 17
The present Kopperå building
NSB's architectural office supplies the station building standing today. 09
A year-round Stockholm link
The commercial association's campaign secures year-round operation of the former summer-only midday trains. 25
A German transport at Storlien
A Swedish border report records soldiers, horses and weapons travelling from Norway through Sweden. 18
The Hommelvik collision
The collision on the historical western section kills 22 people. 14
Two bypasses remain unfinished
The occupying forces attempt routes around Trondheim station; neither is complete at liberation. 24
A family escapes from Hegra
Conductor Arvid Knudsen helps Marie Leirfall and her daughters reach Sweden hidden in a goods wagon. 20
Arvid Knudsen is executed
The railway conductor and resistance worker is killed at Kristiansten fortress. 21
Swedish wires reach the border
Mittbanan is electrified to Storlien and the Norwegian frontier. 10
Rusten returns home
The railway worker returns to Trondheim after surviving imprisonment in several concentration camps. 23
The through night train ends
The final through Trondheim–Stockholm night train runs. 10
Electrification is approved
Parliament decides to electrify the Norwegian border railway. 10
The installation is energised
The new overhead-power system on Meråkerbanen is switched on. 11
Electric trains begin running
The first electric trains operate on Meråkerbanen. 11