Present-day railway · Oslo S-Eidsvoll

Hovedbanen

The line that introduced the railway to Norway — built for timber, travelled by people and still carrying the freight that keeps the national network moving.

First trial run after the rails reached Strømmen · 1853 · Illustreret Nyhedsblad · Public domain
Opened1 September 1854
Current railway68 km
Original gauge1,435 mm
Double trackOslo-Lillestrøm
ExploreRailway linesHovedbanen

Oslo S to Eidsvoll

The first line
Still in service

Hovedbanen is the railway from Oslo S to Eidsvoll.

The modern line is about 68 kilometres long. It is electrified throughout and carries passenger and freight traffic. Between Oslo and Lillestrøm it has two tracks; north of Lillestrøm it largely follows the original corridor on a single-track railway. 01

Most long-distance passenger trains now use Gardermobanen. Hovedbanen remains essential for local services and for freight moving between Alnabru and the lines north of Eidsvoll. 01 05

Christiania-Eidsvoll · 1851 to today

The railway that began the network

Norway's first public railway was built for a clear economic purpose. It connected the capital with the waterways and timber districts beyond Eidsvoll.

01

Timber made the railway urgent

Large quantities of timber moved from the districts around Mjøsa and the Glomma system towards Christiania. The final land transport between Eidsvoll and the capital was slow and expensive. A railway promised a reliable route from the lake and Vorma to the industries, harbour and export trade of the city. 03 05

Passengers were part of the plan, but goods gave the project its commercial foundation. The railway would shorten a road journey that could consume most of a day and make the inland economy less dependent on seasonal transport conditions. 03 05

02

A British-Norwegian railway

Parliament approved the project on 15 March 1851. Half of the capital came from British investors and half from Norwegian interests, including the state. The arrangement made Hovedbanen a private railway with unusually close public involvement. 02 05

Robert Stephenson held the leading technical and economic responsibility. British railway expertise, capital and contractors met Norwegian terrain, labour and political oversight in the country's first large railway project. 02 06

The model
One railway, financed across the North Sea.
03

Built to the gauge Norway later returned to

Construction ran from 1851 to 1854. Unlike many later Norwegian railways designed by Carl Abraham Pihl, Hovedbanen was built to the 1,435-millimetre standard gauge. That decision spared the first line from the large gauge conversions that later reshaped much of the network. 02 05

By 1853 the rails had reached Strømmen. The wood engraving above was published while Norway's first railway was still being built. 07

04

A day became less than three hours

Christiania-Eidsvoll opened on 1 September 1854. The train reduced the journey from roughly a full day on the road to just under three hours. In its first complete operating year, the railway carried about 128,000 passengers and 83,000 tonnes of goods. 03

< 3 hJourney by the new railway
128kPassengers in the first full year
83k tGoods in the first full year

The traffic demonstrated that the railway was not an imported novelty searching for a purpose. It immediately connected people and trade on a scale that justified further lines. 03 05

05

William Graham drove the opening train

William Graham arrived from Yorkshire in 1853 and first worked the ballast trains during construction. The Railway Museum records a daily wage of six kroner, with bonuses linked to economical use of coal. On opening day he drove the official train to Eidsvoll. 04

His story makes the international character of the project tangible. The technology did not arrive by itself: experienced workers came with it, trained others and helped create the railway occupations that Norway had never needed before. 04

06

The terminus became a gateway

Kongsvingerbanen branched away at Lillestrøm in 1862. In 1880 the railway from Eidsvoll to Hamar opened, extending the land route north while Mjøsa and its steamships remained part of longer journeys. Hovedbanen had become the first link in a network rather than a self-contained line. 01 05

The English contractors operated the railway for its first five years. Norsk Hoved-Jernbane then took over, and in 1926 the state assumed ownership and incorporated the operation into NSB. 05

07

War changed the traffic, not the route

When the occupation began, the line from Oslo to Lillestrøm was already double track and electrified, and Hovedbanen formed the first railway link from the capital towards the network farther north. German authorities placed NSB's operating division under their administration and used the existing Norwegian railway network for military transport. Hovedbanen did not need a new alignment to become strategically important; it needed to be controlled. 08 10

No new main-line section of Hovedbanen opened between 1940 and 1945. In the final months of occupation, however, the military use of the wider railway network made it a target. On 14 March 1945, nearly one thousand Milorg members took part in Operation Betongblanding, attacking more than forty railway locations across the Oslo region and surrounding districts to hinder German troop movements. 09

An existing railway under wartime control
The rails were already there. The war changed who controlled the traffic and what the trains carried.
08

The original railway was repeatedly modernised

Traffic near the capital made Oslo-Lillestrøm the first double-track railway in Norway in 1904. Electric operation reached Lillestrøm in 1927 and Eidsvoll in 1953. Each change increased capacity without erasing the original corridor. 01 05

The stations also gave the new technology an architectural identity. Heinrich Ernst Schirmer and Wilhelm von Hanno designed a family of station buildings that helped turn an unfamiliar machine system into recognisable public places. 05

09

Gardermobanen changed the job, not the importance

When Gardermobanen opened in 1998, most faster passenger traffic moved to the new route. Hovedbanen did not become redundant. Local trains continued to serve its communities, and the railway retained the freight flows to and from Alnabru and the lines north. 01 05

A journey towards Trondheim therefore has two layers from the beginning: the modern train may use Gardermobanen, while the historical and operational chain still begins with the railway that taught Norway how to build one.

The whole line in time

From Norway's first railway to today

Parliament chooses the railway

The decision on 15 March establishes a privately financed British-Norwegian railway between Christiania and Eidsvoll.

The rails reach Strømmen

A first trial run is recorded after construction advances east of the capital.

Norway's first railway

Christiania-Eidsvoll opens for regular traffic on 1 September.

A railway in demand

The first full year carries 128,000 passengers and 83,000 tonnes of goods.

Norsk Hoved-Jernbane

The first five-year operating arrangement with the English contractors ends.

A junction at Lillestrøm

Kongsvingerbanen opens and the first railway becomes part of a growing network.

Rails continue north

The Eidsvoll-Hamar railway opens and creates the next landward link beyond Mjøsa.

Norway's first double track

The busy Oslo-Lillestrøm section gains a second track.

Into the state railway

The state takes over the company and operation becomes part of NSB.

Electric to Lillestrøm

Electric operation begins on the southern, double-track section.

The existing railway at war

The route becomes part of the German-controlled transport system; no new Hovedbanen section is opened.

Electric to Eidsvoll

The overhead line reaches the northern end of Hovedbanen.

Gardermobanen opens

The new high-speed route takes most long-distance passenger trains while Hovedbanen keeps its local and freight roles.

The original corridor still works

Local trains share the railway with the freight traffic running to and from Alnabru and the north.

Sources

Norway's first railway

Open each original source, or use Google Translate to read Norwegian pages in English.

07
Wikimedia Commons

Hovedbanen's first trial run, 1853

Open source

Continue north

Dovrebanen
Eidsvoll-Trondheim

The next history follows the main line through Gudbrandsdalen, over Dovrefjell and down to Trondheim.

Read Dovrebanen