Present-day railway · Eidsvoll-Trondheim

Dovrebanen

A national main line assembled over generations — along Mjøsa, through Gudbrandsdalen and across the mountain railway that finally joined the pieces in 1921.

Opening train at Hjerkinn · 1921 · Narve Skarpmoen / National Library of Norway · Public domain
Current railway485 km
Through route complete1921
Highest point1,024 m
Fully electrified1970
ExploreRailway linesDovrebanen

Eidsvoll to Trondheim

One main line
Built in pieces

Today, Dovrebanen means the complete railway from Eidsvoll to Trondheim. In 1908, the name referred more narrowly to the missing mountain section.

The present line runs from Eidsvoll through Hamar, Lillehammer, Dombås, Hjerkinn, Oppdal and Støren to Trondheim. The Railway Directorate measures it at 485 kilometres. 01

The Dombås-Støren section approved in 1908 supplied the decisive connection. Older railways north and south were rebuilt and gathered into the through main line now known by the same name. 01 04

Eidsvoll-Trondheim · 1864 to today

The main line built from both centuries

Dovrebanen did not open as one project. Its oldest section predates the mountain crossing by almost six decades; the continuous railway emerged only after construction fronts met across Dovrefjell.

01

The ends existed before the middle

The northern section from Trondheim to Støren opened as a narrow-gauge railway in 1864. From the south, the railway reached Hamar from Eidsvoll in 1880, Tretten in 1894, Otta in 1896 and Dombås in 1913. 01

Each stage served its own district before it became part of a national through route. Mjøsa and Gudbrandsdalen therefore had railway histories long before a train could continue over Dovrefjell to Trondheim. 01 04

1864Rails from Trondheim
1880Rails north from Eidsvoll
1921The missing link opens
02

Parliament chose the mountain connection

In 1908 Parliament approved the Dombås-Støren railway. At that moment “Dovrebanen” described the new section across and north of Dovrefjell, not automatically every older kilometre between Eidsvoll and Trondheim. 01 04

The project linked the southern standard-gauge railway with the northern system. Existing narrow-gauge railways had to be rebuilt so that a train could make the complete journey without a change of gauge. 01

03

The railway climbs above one thousand metres

North of Dombås, the line crosses the Dovre plateau, reaches Hjerkinn and descends through Drivdalen towards Oppdal. Its highest point is about 1,024 metres above sea level just north of Hjerkinn. 01 04

The engineering challenge was not only gradient and rock. Snow, wind, exposed terrain and the distance from established supply routes shaped both construction and later operation. The railway had to become a permanent mountain system rather than a single completed work. 02 04

The mountain line
The connection was finished in 1921. The work of keeping it open never was.
04

The stations were designed as part of the landscape

Competitions held in 1911 and 1912 helped define the architecture of the stations over Sel and Dovrefjell. Arnstein Arneberg and Erik Glosimodt developed nationally inspired designs in wood and stone for the new mountain railway. 04 05

The buildings were practical railway facilities, but they also gave the project a public image. The architecture announced that the difficult route across the mountain belonged to a national network. 04 05

05

The final link opened at Hjerkinn

Dombås-Støren entered service in 1921. King Haakon VII officially opened Dovrebanen at Hjerkinn on 17 September, completing the continuous railway from Eidsvoll to Trondheim. 01 02

The photograph above shows the decorated train, the crowd and the high mountain station during the ceremony. It was taken by Narve Skarpmoen. 07

06

The celebration was followed by tragedy

On 18 September, the day after the opening, the returning guest train collided with a northbound express at Nidareid outside Trondheim. Six people were killed and fourteen were injured. Architect Erik Glosimodt was among those who died. 05 06

The accident belongs in the history because it occurred directly in the opening journey and affected people who had helped create the line. It is recorded here without turning loss into spectacle.

07

The completed line became a military artery

Dovrebanen had been complete for nineteen years when Germany invaded Norway. No new main-line section between Eidsvoll and Trondheim opened during the occupation. What changed was the use of the railway. Dombås connected Dovrebanen with Raumabanen and therefore controlled rail movement both north-south and towards the coast at Åndalsnes. 01 13

German paratroops attacked Dombås on 14 April 1940. The Directorate for Cultural Heritage describes railway traffic as a lifeline of the German military system and Dombås as one of its most important inland junctions. The occupying forces then developed a large military area around the town, used it for troop transit and rest, and held between 5,000 and 10,000 personnel there. The wider complex contained about 180 large barracks, hundreds of smaller buildings and camps for Yugoslav and Soviet prisoners of war. 13

14 AprDombås attacked in 1940
5k-10kmilitary personnel in the area
180large barracks recorded

By the final winter of occupation, the same transport value made the inland railways targets for resistance operations. Operation Grebe was tasked with disrupting road and railway movements through northern Østerdalen and Gudbrandsdalen, with actions extending to the railway at Otta. The wartime story of Dovrebanen is therefore chiefly one of control, military transport, protection and sabotage — not of a new railway being laid across Dovrefjell. 14

08

Electric operation took another generation

Electric trains reached Hamar in 1953. The conversion then advanced north in stages until the full Eidsvoll-Trondheim railway was electric in 1970. 01 04

Electrification changed traction and capacity but not the essential geography. Passenger and freight trains still shared a long, mostly single-track main line through valleys and mountain terrain. 01

09

A national corridor still being rebuilt

Dovrebanen remains one of Norway's principal north-south railways for both passengers and freight. Modern projects have begun replacing constrained sections with double track: Langset-Kleverud opened in 2015 and Eidsvoll-Langset in 2023. 01 03

The line's history is therefore not a closed centenary story. The same corridor assembled from nineteenth- and twentieth-century railways is being changed again to carry twenty-first-century traffic. 01 03

10

When the freight lifeline broke

All through freight between Oslo and Trondheim normally runs over Dovrebanen, and rail holds about half of the freight market on that route. At Trondheim, the transport chain continues directly onto Nordlandsbanen, with freight terminals at Mosjøen, Mo i Rana, Fauske and Bodø. Dovrebanen is therefore both the freight lifeline to Trondheim and the southern link in a rail corridor that reaches all the way to Bodø. 01 08

In August 2023, flooding during Storm Hans undermined a foundation of Randklev bridge at Ringebu. Two bridge spans fell into Gudbrandsdalslågen, cutting the through route for nine months. The rebuilt bridge reopened on 20 May 2024; the first train across it was a freight train heading towards Oslo. 09 11

9 monthswithout a through route
≈ 50%fall in rail freight
NOK 1.4bnestimated societal cost

As much freight as possible was diverted over Rørosbanen. From 4 September, freight departures between Hamar and Røros increased from two to six a day in each direction, while passenger departures were reduced from six to two. Even with that priority, there was not room for every freight train. Rørosbanen has lower capacity than Dovrebanen, and its diesel operation created an additional problem: there were not enough suitable locomotives to reproduce the normal service. 10 12

The result was an approximate halving of rail freight between Oslo and Trondheim, with much of the displaced volume moving to road. Bane NOR later estimated the total societal cost of the closure at about NOK 1.4 billion, including roughly NOK 215 million in added costs for freight customers and NOK 75 million in external costs from increased road traffic and diesel operation. 10 11

Randklev made the dependency visible
Rørosbanen kept part of the freight system moving. It could not become Dovrebanen overnight.

The whole line in time

From separate lines to the Dovre route

Trondheim-Støren

The northern ancestor of the line opens as a narrow-gauge railway.

Eidsvoll-Hamar

Rails advance north from Hovedbanen and reach the eastern shore of Mjøsa.

Hamar-Tretten

The railway enters Gudbrandsdalen in stages.

Tretten-Otta

The northern railhead reaches Otta.

The Dovre decision

Parliament approves the Dombås-Støren railway across the mountain.

Otta-Dombås

The southern railway reaches the future mountain junction.

Across Dovrefjell

Dombås-Støren opens and creates a continuous railway to Trondheim.

Official opening

King Haakon VII opens the completed mountain railway at Hjerkinn.

Nidareid

The opening guest train collides with a northbound express outside Trondheim; six people are killed and fourteen injured.

Dombås becomes a target

German paratroops attack the strategic junction between Dovrebanen and Raumabanen.

Electric to Hamar

The first long southern section gains electric operation.

Fully electric

Electric operation is complete from Eidsvoll to Trondheim.

Langset-Kleverud

A new double-track section opens along Mjøsa.

Eidsvoll-Langset

The double-track railway extends north from Eidsvoll.

Randklev bridge collapses

Flooding during Storm Hans destroys the bridge at Ringebu and breaks the through route on Dovrebanen.

The freight route reopens

The first train over the rebuilt Randklev bridge is a freight train bound for Oslo.

A national main line

Passenger and freight trains continue to share the long railway north from Eidsvoll to Trondheim.

Sources

From Eidsvoll across Dovrefjell

Open each original source, or use Google Translate to read Norwegian pages in English.

07
Narve Skarpmoen / Wikimedia Commons

Opening of Dovrebanen, 1921

Open source

The older inland route

Rørosbanen
Hamar-Støren

Before Dovrebanen became the main route, trains reached Trondheim through Østerdalen and Røros.

Read Rørosbanen