No matching accounts
Try another place, year or subject.
The chronology shows all accounts.
1921
· Collision
Nidareid
Railway histories: Dovrebanen
On 18 September 1921, a northbound passenger train and an extra train returning guests from the opening celebrations for Dovrebanen collided near Nidareid in Trondheim. Six people died. 01
Returning from the opening celebrations
The ceremonial opening of Dovrebanen had brought invited guests to Trondheim on 17 September. Some of them left for the capital on an extra train the following evening. This train met ordinary railway traffic on its way out of Trondheim. The northbound train should have waited at Marienborg for the extra train to pass. Instead, it continued towards Nidareid. The trains collided just south of the tunnel. 01
Train 361 passed Marienborg without stopping
The southbound extra train was identified as train D, with departure from Trondheim scheduled for 23:45 on Sunday 18 September. The circular setting out its timetable specified a crossing with northbound train 361 at Marienborg. That meeting was therefore part of the published arrangements for the extra service. Train 361 passed the crossing station without stopping. 03
Six people were killed
Among those killed were telegraph director Thomas Thomassen Heftye and architect Erik Glosimodt, whose work included the buildings on Dovrebanen. The other victims included senior public officials, military officers and a cartographer. Other people on the trains were injured. 01 05
All four defendants were acquitted
The defence pointed to unclear and incomplete circulars and regulations, weaknesses in preparing and issuing instructions, possible shortcomings in safety training, workload and staffing. They linked the missed stop to how instructions were written, communicated and understood. 04
Three employees from the northbound train and a telegraphist at Marienborg were prosecuted. Their trial took place in Trondheim’s court of appeal in February 1922. All four defendants were unanimously acquitted. 01
Rule changes were already under way
NSB, the Norwegian State Railways, had begun developing a new signalling arrangement before the collision. A signal engineer took up the work in 1919, and additional staff helped establish a signalling office. In May 1921 the board appointed a committee to review the signalling regulations. Their relationship with the other operating rules made a wider revision necessary. In October the board appointed three traffic inspectors to work on those rules. 02
NSB adopted new rules in December
The accident exposed shortcomings in the operating rules and signalling arrangements and accelerated their revision. On 5 December 1921, the board approved a temporary regulation for the new signalling system, issued with circular 184. It would apply to interlockings built to the new arrangements as they entered service. This was an adopted change within a programme that had begun before Nidareid. 02
Sources for Nidareid
Glede, sorg og sikkerhet — Jernbanemagasinet 2/2011, page 48
Sikkerhetstjenesten ved norske jernbaner i de første 100 år, 1854–1954 — del I, pages 20–21
Sikkerhetstjenesten ved norske jernbaner i de første 100 år, 1854–1954 — del II, extra-train timetable circular
Sikkerhet på skinner? Oppfatninger om sikkerhet på norske jernbaner 1950–2000 — SINTEF A3144, section 3.2
Nidareidulykken
1935
· Derailment
Sporpind
Railway histories: Randsfjordbanen
On 10 October 1935, a steam train derailed at Sporpind near Åmot after rain damaged the railway embankment. The driver and fireman died. 02 03
The railway beside Drammenselva
Randsfjordbanen originally connected Drammen with Randsfjord. It had been converted from narrow gauge to standard gauge in 1909; electrification followed in 1959, more than two decades after this accident. The line follows Drammenselva through this part of Modum. 04
The evening train was heading towards Drammen. Trackman Andreas Linnerud had crossed the site by bicycle trolley around 17:00 without noticing anything wrong. Another train passed less than an hour later. 01
The locomotive and coaches derailed
The locomotive overturned towards the river. The first coach overturned, the second spanned the gap with its bogies on either side, and the third remained on the rails. Linnerud returned after hearing unusual sounds. Aftenposten’s report, reproduced in the local history, described passengers in the first coach escaping with minor injuries. 01
Help at the wreck
Engineer Ravnsborg, who lived nearby, and the conductor helped the fireman. Four doctors arrived. With the ambulance unavailable, a lorry took him to Drammen hospital, where he died. The driver died trapped in the locomotive. Both men suffered fatal steam burns. 01
Rain damaged the embankment
TVModum’s later account describes rain damaging the fill beneath the track and the locomotive falling down the slope towards the river. The failure involved the material supporting the railway, leaving the train without a sound track to run on. 03
Writing in 1997, Kristian Linnerud suggested that water caused the accident. His explanation is retrospective, rather than a quoted inquiry finding. 01
Rebuilding the railway
Crews recovered the train, built a temporary track across the slip, then made a diversion east into the hillside. They later filled the site with stone, restored the original alignment and provided a large culvert. 01
A childhood memory of the accident
Grethe Hølen was three years old when the accident happened. Writing in 2020, she remembered her mother telling two of her siblings to take her with them. They lifted her from bed and hurried along Fardalsletta. She also recalled people calling out about injuries. Hølen named the men who died as driver Trondsen and fireman Warlo. 02
A memorial beside the walking trail
In July 2021, Østre Åmot Vel put up an information panel about the accident along the Modum på langs walking trail. It included Aftenposten’s front page from the following day. TVModum reported on the panel that August, 86 years after the derailment. The initiative brought the story back to the place where it happened, making it accessible to people using the riverside path. 03
Sources for Sporpind
Sporpind-ulykken i 1935 · Gamle Modum 1997, pp. 20–21
Livet langs den gamle riksveien fra Stuten til Bålettbakken · Gamle Modum 2020, p. 70
Satte opp skilt med informasjon om togulykke fra 1935, 17 August 2021
Randsfjordbanen: original route, gauge conversion and electrification
1940
· Collision
Hommelvik: collision between two passenger trains
Railway histories: Meråkerbanen (historical Trondheim–Hell section)
On 19 November 1940, a train carrying workers towards Værnes collided with a local train from Kopperå near Hommelvik. The two trains were meant to pass each other at the station. 01
Workers travelling to Værnes
The workers' train was hauled by a steam locomotive with ten carriages. Most passengers were travelling to construction work at Værnes airfield. The opposing train consisted of a motor coach and a trailer. A motor coach carried passengers and its own engine, unlike the locomotive-hauled train. The collision occurred at Nygården, beyond Hommelvik station, at about 08:03. 01
The complete workers' train weighed about 427 tonnes, while the motor-coach train weighed about 44 tonnes. 02
Departed before the other train arrived
The station's traffic dispatcher gave the conductor in charge a conditional departure message: the workers' train could leave once the train from Kopperå had arrived. The conductor believed that the opposing train was already standing in the station and gave the departure signal. It was still approaching. Wartime blackout restrictions, poor visibility and reduced lighting made identification difficult. The dispatcher tried to have the departing train or the approaching local train stopped by telephone, but neither could be reached in time. 01
The line reopened the following morning
The motor coach was destroyed in the collision. Railway repair staff were brought from Trondheim, and a tool wagon was sent towards the site. The work included recovering the vehicles and repairing about ninety metres of damaged track. The locomotive was back on the rails on the morning of 20 November, and the line reopened that morning. Survivors were treated in Trondheim; the injuries and deaths affected families in the communities served by the local train, including Meråker and Hell. 02
Conditional departure messages were common
Judicial examinations began at Strinda and Selbu the following day. Six railway employees were temporarily suspended while the events were investigated. The district manager also asked experienced stationmasters whether they used conditional departure messages. Many replied that they did, during the irregular and heavy wartime traffic. The dispatcher received a serious warning for using this form of message. The conductor was moved to shunting duties and did not regain his former position until after the war. 02
NSB reinforced existing rules
An instruction of 11 September 1940 already limited station entries for crossing or overtaking to 20 km/h, except air-braked trains admitted by a main signal in daylight. After Hommelvik, NSB reinforced this and other safety provisions in a circular acknowledging difficult working conditions. 03
Sources disagree on the death toll
NSB's safety history records twenty-two deaths. 03
Store norske leksikon gives an estimated twenty-three; the published totals differ. 04
Sources for Hommelvik: collision between two passenger trains
Jernbanestasjoner i Malvik, March–April 2003: Hommelvik
1940: Togulykken i Hommelvik
Sikkerhetstjenesten ved de norske jernbaner de første 100 år, del II, p.183
Jernbaneulykke, updated 4 June 2025
1944
· Collision
Breifoss: collision and fire
Railway histories: Bergensbanen
On 28 February 1944, an eastbound freight train ran beyond Geilo and collided with the westbound night train near Breifoss. Fire broke out in the trains. At least twenty-five people died; the complete wartime death toll is uncertain. 03
Unable to stop at Geilo
Freight train 1428 had fifteen two-axle wagons, mostly tank wagons carrying petrol or oil. Passenger train 607 was travelling west from Oslo. They were due to pass at Geilo, but the freight train could not stop on the descent from Ustaoset. The line there fell at twenty metres per kilometre. 01
Fuel leaked and caught fire
The driver and fireman left the freight locomotive before Geilo. The conductor continued trying to apply wagon brakes. The collision occurred near kilometre 246.7 at about 02:53. Escaping fuel flowed towards the passenger train and ignited. Staff and passengers detached four passenger carriages and a goods van and moved them away. 01
An emergency hospital opened in Ål
Survivors gathered at Vestreim, and an emergency hospital was set up in Ål station. Local doctors and nurses, including staff from Geilomo children's hospital, attended. A medical train later arrived from Drammen. The railway clearance involved seventy-five workers, among them Norwegian and German specialists and Soviet prisoners. Reopening the damaged route took sixty-seven hours. The wrecked carriages were taken to Ål. 02
Cold was a probable factor
NSB could not demonstrate a definite defect in the air brakes afterwards. Its district history considered that severe cold and the lubricants in use had probably made them respond slowly. It also considered the locomotive's steam brake and some wagon brakes insufficiently effective. These were probable explanations, with uncertainty retained in the railway's own account. 01
Earlier in the journey, the brakes had worked during stops at Myrdal and Haugastøl. NSB's director-general requested a judicial investigation the next day because the railway's experts could not establish the cause with certainty. The freight driver and fireman were arrested, held in Bergen and then transferred to Grini. They were released in November, when the police accepted technical causes. This sequence is described in Hol's municipal history; the arrest itself does not establish responsibility for the brake failure. 02
The municipal history also describes severe cold, around −28°C, and possible frost inside brake cylinders after the train's journey from the milder west. 02
The death toll remains uncertain
The local police initially reported twenty-one deaths; a later NSB list named twenty-five victims. 02
NSB's district history separately records twenty-five civilian deaths, the passenger driver and an unknown German total. 01
Sources for Breifoss: collision and fire
Norges Statsbaners krigshistorie 1940–1945, Bergen distrikt, pp.29–30, case 303/44 (OCR copy)
Hol i hundre år, volume I (2000): Breifoss, reproduced 25 August 2017
Jernbaneulykke, updated 4 June 2025
1945
· Sabotage
Jørstad: derailment after bridge sabotage
Railway histories: Nordlandsbanen
On 13 January 1945, a troop train derailed at Jørstad, several hours after the railway bridge had been demolished in a wartime sabotage operation. Both German servicemen and Norwegian railway workers were killed. 01
Disrupting German troop movements
After Finland's armistice with the Soviet Union in September 1944, German forces withdrew through northern Norway. The Allies sought to delay troops and equipment that could be sent to the fighting in continental Europe. Nordlandsbanen was one of the routes used for movement south. Attacking its bridges could interrupt a railway connection needed for those transports. 02
Woodlark demolished the bridge
Woodlark belonged to Norwegian Independent Company No.1, better known as Kompani Linge. The group operated from the Swedish side of the border and targeted the railway. 02
Five men reached the unguarded bridge on the evening of 12 January. It was thirty metres long and about five-and-a-half metres high. One kept watch while four fitted charges. Ice on the steelwork and passing trains complicated the work. The northern end of the bridge was demolished at about 02:30 on 13 January. 01
The troop train derailed
At about 08:15, a southbound troop train passed Jørstad station. It had thirty-one wagons. Its locomotive and the first seventeen wagons were wrecked at the destroyed crossing. The Norwegian driver and fireman were killed. 01
The local memorial account gives seventy-eight German dead and two Norwegian dead in the crash; another Norwegian died during clearance. 02
Local people took in the injured
People living nearby helped the injured German soldiers. Many received medical treatment in local homes. 03
Traffic resumed after six days
Clearing the wreck and rebuilding the crossing began immediately. German engineer troops constructed a temporary bridge, and local people also assisted. Trains could use the route again after six days. 01
A temporary alignment and bridge were laid beside the demolished crossing. Traces of that emergency railway survive between the later railway and road. 02
Woodlark and Rype were separate operations
Jørstadelva war memorial opened on 8 May 1995. It commemorates both Woodlark and Operation Rype. Rype was a separate, American-led force dropped into the Snåsa mountains in March 1945. The January bridge attack was Woodlark's operation. The memorial was established around remembrance, peace and reconciliation. 02
A joint American–Norwegian commemoration in 2015 included a German representative. Alongside recognition of the sabotage mission, the ceremony remembered the approximately eighty people killed in the derailment and the additional Norwegian life lost during rescue and recovery. Local help for the injured was part of that remembrance. 03
Sources for Jørstad: derailment after bridge sabotage
Nordlandsbana: Nordlandsbanen 60 år i 2022, pp.15–16
Jørstadelva Krigsminne
Minnesota, Norwegian Service members retrace successful World War II mission, 2 March 2015
1950
· Collision
Hjuksebø: runaway wagons collide with a passenger train
Railway histories: Sørlandsbanen
On 15 November 1950, freight wagons ran away from Hjuksebø and collided with Sørlandsekspressen, approaching from Kristiansand. Fourteen people died. The accident began during shunting at the junction, before the passenger train reached the station. 01
Shunting at Hjuksebø
Hjuksebø connected the Sørland railway with the line towards Notodden and Tinnoset. The Notodden–Tinnoset railway had opened in 1909; the Porsgrunn–Hjuksebø–Notodden connection followed in 1917. Together these routes formed part of Hydro's transport system between Rjukan and Herøya. 02
At the station, freight vehicles were moved between tracks and assembled into trains. That work was known as shunting. 01
Uncoupled wagons rolled towards the passenger train
A shunting locomotive moved against a group of freight wagons that had not all been coupled together. Wagons were pushed onto the falling line towards Holtsås. Sørlandsekspressen was coming in the opposite direction. It was a type 66 electric multiple unit, a passenger train with driving cabs rather than a separate hauling locomotive. One runaway wagon carried timber telephone poles. The leading passenger vehicle was destroyed in the collision. 01
The driver and eleven passengers died immediately; two injured passengers later died. 01
Passengers connecting from Arendal and Kragerø had been allocated seats in the leading vehicle under NSB's reservation arrangements, according to Skobba and Kleppen. 03
Staff could not stop the wagons
The later investigation by Ingvar Skobba and Halvor Kleppen describes the shunter running after the wagons and climbing aboard in search of a brake. He could not stop them. Staff telephoned Nordagutu to try to stop the approaching passenger train, but it had already left. These attempts depended on reaching the vehicles or another station; they did not establish direct communication with the moving passenger train. 03
Coupling was already required
Coupling the wagons was already required by NSB's rules. ESRA's historical account identifies the failure to do this as a condition that probably allowed the accident. It also places Hjuksebø within a railway system in which responsibility for safe train movement rested heavily on individual employees and their observance of detailed instructions. 04
The case against the shunter was dismissed
Skobba and Kleppen's account, discussed when their book appeared in 2000, examined the workload at the station and the treatment of the shunter afterwards. They reported six trains at Hjuksebø within one hour that morning. The shunter, Anders Brennås, was suspected of negligent killing, but the prosecution authorities dismissed the case. Their criticism of NSB concerned the search for an individual to blame and the railway's response to the wider circumstances. It was a later historical assessment, distinct from the criminal case. 03
NSB tightened the shunting rules
NSB's postwar safety history records that the accident led to a stricter requirement for shunting on a station gradient when a train was expected. 05
Sources for Hjuksebø: runaway wagons collide with a passenger train
Hjuksebøulykken
Tinnosbanen
Men NSB lærte ingen ting? — 14 November 2000
Risikostyring i Norge gjennom 50 år — railway safety history, p.23
Sikkerhet på skinner? — SINTEF A3144, p.136, quoting NSB Sikkerhetstjenesten, part II
1953
· Landslide
Bekkelaget: the 1953 landslide
Railway histories: Østfoldbanen
On 7 October 1953, a landslide cut through Mosseveien and Østfoldbanen at Bekkelaget in Oslo. The approaching local train stopped before the broken railway. A bus was caught in the slide. 01
Road and railway shared an embankment
Road and railway occupied an embankment beside the hillside. When the railway was doubled in 1920, a retaining wall about 3.5 metres high was built beside the road. At either end it stood on rock, but along roughly ninety metres it rested on the road embankment. The ground included marine clay deposited when the area lay below sea level. Further filling accompanied road improvements in 1949 and temporary road work in September 1953. 02
The train stopped short of the landslide
The slide began at 07:37 and lasted less than half a minute. Railway foreman Bjarne Kristoffersen ran towards the approaching train. Its driver had seen disturbed ground and extinguished signals and had already braked. Four people in the bus were killed. The archival account also records that a passenger on the stopped train subsequently died from shock. 01
Filling and excavation had weakened the slope
The investigation concerned the stability of the whole slope. Salt had been washed from the marine clay, reducing its stability, while filling and excavation had altered the loads. NGU’s later technical account describes a sheet-like slide: upper ground moved outward and subsided, while parts of the displaced ground remained in large coherent blocks. Houses could therefore move with a block while retaining much of their structure. The railway’s retaining wall and the road foundation were part of the same ground system. 02
One track reopened on 24 October
Road traffic was diverted through smaller streets. NSB restored one railway track on 24 October. 01
The tunnel was planned before the landslide
The original Bekkelaget station, opened in 1879, closed on 7 September 1958. 03
The tunnel, station closure and wider redevelopment are often remembered as consequences of the slide. The surviving investigation material shows that these changes were already planned before it happened. 01
Sources for Bekkelaget: the 1953 landslide
Raset på Bekkelaget, Arkivmagasinet 1/2012, pp.16–18
NGU 2012.040: landslide catalogue, Bekkelaget
Bekkelaget original station: historical station record
1975
· Collision
Tretten
Railway histories: Dovrebanen
On 22 February 1975, two passenger trains collided north of Tretten station on Dovrebanen. Twenty-seven people died and twenty-five were injured. The trains should have passed one another at the station. 01 02
Emergency braking did not prevent the collision
The trains carried almost eight hundred passengers between them. They met north of the station rather than crossing on its separate tracks. Both drivers saw the other train and applied emergency braking, but the trains collided. Emergency services, passengers and people from the surrounding area took part in the rescue. People were trapped in the damaged coaches, and the last survivor was brought out after about six hours. 01
The trains were due to cross at Tretten
Northbound passenger train 351 was travelling from Oslo to Åndalsnes. The opposing service, express train 404, was travelling from Trondheim to Oslo. Tretten was the station where the two services were due to meet. The northbound train left before that crossing had taken place. 02
The inquiry focused on the missed signal
NSB’s internal inquiry found no failure in the safety equipment and concluded that the northbound train had passed the departure signal at stop. In 2015, a government inquiry examining how serious events are investigated used Tretten to illustrate the limits of that approach. The original investigation had concentrated on the sequence of events and the signal passage. It had not examined whether the railway company’s safety organisation and management system were adequate. 03
Neither crew member was convicted
The criminal proceedings did not end with convictions of the two crew members held responsible in the original investigation. The case against the driver was dropped, and the conductor was acquitted. 04
Tretten accelerated work on ATC
Research into automatic intervention predated Tretten. NSB began working with SINTEF in 1966, and successful trials of a radio-based emergency-stop system followed in 1971. Cooperation with Swedish State Railways developed a compatible system that could also supervise speed. Tretten accelerated this work. A trial section between Lørenskog and Sørumsand entered use in 1978. Automatic Train Control, ATC, transfers signalling information from the track to the train and can apply the brakes when the train is not being controlled in accordance with that information. 05
Further signalling changes followed
Changes were also made to the signalling equipment. A later technical review for the Railway Inspectorate records the introduction of pole-face spacers to prevent relays sticking and of repeat lockout in the line-block system after Tretten. Relays are electrically operated switches within the signalling circuits. Repeat lockout provides an additional check intended to prevent a new departure route being released before the preceding train has reached the next station. 06
The 2001 review found differences between installations in how repeat lockout was implemented. It recommended checking that the measures previously recommended after Tretten had been installed, including pole-face spacers in all safety relays. It also recommended logging at remote-control and interlocking installations. 06
Sources for Tretten
Tale på minnemarkering – 50 år siden Tretten-ulykken, delivered 22 February 2025
Tretten-ulykka
NOU 2015:11 — section 3.5.5.4, approaches to accident investigation
Tretten-ulykken — account of investigations and criminal proceedings
Hastighetsovervåkning — history and operation of ATC
Vurdering av pålitelighets- og sikkerhetsanalyser av sikringsanlegg, 29 March 2001
1990
· Collision
Lysaker / Vækerø
Railway histories: Drammenbanen
On 16 April 1990, two local passenger trains collided at Vækerø between Skøyen and Lysaker. Five people died: two passengers and three railway employees. NSB recorded fourteen passengers as seriously injured. 01
The local train passed a stop signal
The train should have waited while the overnight service to Stavanger passed. 02
Instead, the westbound local train passed a main signal at stop at Skøyen station and continued towards Lysaker on the track used by a local service heading towards Oslo. 03
Intervention unsuccessful
The traffic controller detected the irregular movement and activated emergency disconnection of the overhead power supply. The trains nevertheless collided. 03
No ATC or train radio
Oslo S and Skøyen lacked ATC coverage, and there was no train-radio connection. The stop signal could tell the driver to stop, but there was no automatic protection there to intervene after the signal was passed. Disconnecting the overhead supply removed traction power; it did not itself apply the brakes. 03
DNV’s later review recorded that the eastbound train braked before impact and the westbound train did not. It left unresolved whether the eastbound braking followed the power interruption or its own approach signal returning to stop because the other train occupied the track. 03
The safety review predated the collision
The broader review of NSB’s safety work was under way in 1989, and its report was delivered in 1990. In its annual report, NSB described the assessment as broadly favourable while recognising that it provided a basis for specific improvements. 01
Parliament increased ATC funding
The Åsta Commission recorded that Lysaker and the DNV review accelerated ATC funding in the 1992 and 1993 state budgets. Parliament approved those changes. Funding the programme did not mean every route immediately had automatic protection. 04
ATC was in place by 2004
By 2004, the ministry’s national status report placed the Oslo–Drammen main line among the routes already equipped with centralised traffic control and ATC. It distinguished partial ATC, which supervises stop signals, from full ATC, which also supervises the line’s speed restrictions. This distinction helps explain what automatic protection adds to the trackside signals on which the trains had depended in 1990. 05
Sources for Lysaker / Vækerø
NSB annual report 1990, page 4 — Lysakerulykken and the safety review
Lysakerulykken 16. april 1990 — Sikkerhetsdagene 2004 case study
Risikoanalyse av Jernbaneverkets system for nødfrakobling — report 2011–1151, sections 2.1–2.2 and 6.2.2.1
NOU 2000:30 — Åsta-ulykken, 4 January 2000, chapter 8
Nasjonal transportplan 2006–2015 — question 134, railway safety and ATC status, 2004
1993
· Runaway vehicle
Nordstrand: collision with a runaway locomotive
Railway histories: Østfoldbanen
On Sunday 3 October 1993, a locomotive rolled backwards into the Skøyen–Ski local train at Nordstrand. Five passengers died. Several people, including both drivers, were seriously injured. The locomotive had been travelling ahead of the local train before stopping at Rosenholm. 01
The air brakes were isolated
The DE 6400 locomotive left Lodalen with the shut-off valves for its brake cylinders in the wrong position. Its compressed-air brakes were consequently unavailable. During the journey it still had electrodynamic braking, with two parking brakes applied. At Rosenholm the parking brakes were released and the locomotive began rolling in the wrong direction. The electrodynamic brake could not be engaged once it was moving backwards. The braking arrangements that had worked during the outward journey could therefore no longer stop it. 01
Training and preparation had shortcomings
Starting instructions for type DE 6400 specified the correct valve positions, but this did not prevent the locomotive leaving Lodalen with isolated air brakes. 01
The court proceedings identified shortcomings in the type-training course and stressful, partly chaotic conditions during preparation. The driver was required to check the valves; the brake-cylinder pressure gauge had shown zero. 02
Acquittal overturned; driver convicted at retrial
Oslo City Court acquitted the driver on 23 February 1995. The Supreme Court annulled that judgment on 13 October, finding that the court had applied too lenient a standard of care. On 9 February 1996, a retrial in Oslo City Court convicted him of negligent conduct causing a railway accident. The Supreme Court required a strict standard of care for a locomotive driver: the stress described by the lower court did not remove responsibility for failing to notice the closed valves. 02
NSB labelled the brake equipment
Brake-equipment labelling became a separate issue after the accident. In Parliament on 1 February 1995, transport minister Kjell Opseth reported that NSB had marked compressed-air equipment, especially equipment connected with the brakes, on all locomotives of the type involved at Nordstrand. He explained that the valves on these locomotives had an unusual design. 03
NSB had also arranged a meeting with the Labour Inspection Authority to review its brake-labelling routines against the requirements for technical equipment. The minister said he could not then determine whether the legislation had been breached. 03
The alarm proposal was not followed up
SINTEF recommended audible warnings for traffic controllers. A technical solution was ready in December 1993, but no alarm had been installed by June 1994. The Åsta commission later found that the follow-up had failed. 04
Train radio and alarms were still missing
Most Nordstrand measures were completed by early 1995, according to SINTEF's historical study. Audible control-room warnings and train radio were exceptions. NSB also accepted a NOK 150,000 corporate fine under working-environment legislation. 05
Sources for Nordstrand: collision with a runaway locomotive
Storulykker i Norge de siste 20 årene — Nordstrand, pp.145–146
Rettslig ansvar og sikkerhetsmessige konsekvenser — STF50 A07017, pp.50–51
Question 13 — transport minister Kjell Opseth, 1 February 1995
NOU 2000:30 — §8.8.2, follow-up after Nordstrand
Sikkerhet på skinner? — SINTEF A3144, Nordstrand follow-up
2000
· Collision and fire
Åsta: collision and fire
Railway histories: Rørosbanen
Nineteen people died when two passenger trains collided at Åsta on Rørosbanen on 4 January 2000. The subsequent investigation and follow-up addressed signalling, communication, safety management and independent accident investigation. 01 03
The trains collided and caught fire
The single-track diesel route through Åsta was remotely controlled from Hamar. Both trains carried automatic train-stop equipment; the track had not been fitted for it. There was no train radio. The controller could not find the trains’ mobile numbers when the danger became apparent. At 13:12:35, northbound train 2369 from Hamar collided with southbound train 2302 from Trondheim near Åsta, between Rudstad and Rena. Fire developed around the damaged locomotive and northbound railcar, then spread through the southbound carriages. Sixty-seven people survived. The last surviving passenger was freed at about 17:00. 02
The immediate cause remained uncertain
The commission could not establish the immediate cause with certainty. Its technical assessment indicated that the northbound exit signal at Rudstad should have been red. Tests had not demonstrated a physical fault responsible for the accident. But the NSB-87 interlocking—the system governing signals and points—had deficiencies serious enough that a brief malfunction could not be excluded. The displayed signal aspect remained unresolved. 03
It identified inadequate safety management at NSB and the infrastructure manager Jernbaneverket as the principal reason the accident had been allowed to occur. The railway lacked sufficient protection against a single failure. Signalling weaknesses, shortcomings at Hamar control centre, unreliable communication with trains and deficiencies in supervision formed part of that finding. Its recommendations included automatic train stop, train radio, audible alarms, signalling reviews and examination of older vehicles and their fire safety. Some recommendations restated requirements that already existed but had not been fulfilled. 03
Jernbaneverket accepted a corporate penalty
The criminal investigation and the safety inquiry addressed different questions. The Director of Public Prosecutions concluded that Jernbaneverket had operated the railway with an inadequate overall level of safety, without compensating for missing protections. An unapproved change to the departure procedure was among the weaknesses identified. Jernbaneverket accepted a NOK 10 million corporate penalty. No criminal action was proposed against individuals or other institutions. Because the immediate cause remained unresolved, the prosecution did not use the provision concerning negligently causing a railway accident. The penalty concerned unsafe operation of the railway. 04
The government reported in 2001 that Jernbaneverket had developed a new safety-management system and was implementing it. Safety work was placed under a safety director, regional safety managers had been appointed, and the Railway Inspectorate was auditing the system and holding regular progress meetings. Risk assessments of departure procedures had been conducted in autumn 2000. Revised arrangements were submitted to the Inspectorate, with a planned introduction on 20 May 2001. That was a target date, not confirmation that the changes had entered use. 04
Stations returned to local control
When the railway reopened after the accident, remote control was taken out of use. Station staff again controlled train movements locally. In Parliament on 17 January 2001, the transport minister explained that this arrangement would continue while the signalling design was reviewed and automatic train stop prepared for use. An audible alarm had no function at Hamar while remote control remained switched off. 05
Signalling had to be reviewed and upgraded
Jernbaneverket’s contemporary account described the work as a linked programme: upgrading NSB-87 interlockings, independently examining their design, restoring remote control, adding automatic train stop, revising control-centre routines and improving emergency communication. Fourteen station installations were involved. Documentation had to be completed, operating instructions and a training plan prepared, and technicians trained alongside the upgrading. Installations that had accumulated changes over time were to be brought to a consistent standard. 06
The programme also required risk assessments of the changes and approval by the Railway Inspectorate. Jernbaneverket reported 32 changes and improvements within the overall project. Project manager Brede Nermoen explained that the original deadline had not been sufficiently justified. The work had been brought under common project management in February 2001. 06
On 9 May 2001, the minister told Parliament that the train-stop equipment had been installed by summer 2000, tested and approved. Entry into use was nevertheless tied to the interlocking review. Jernbaneverket and the Inspectorate were then considering introducing automatic train stop while stations remained locally staffed. The minister distinguished this from restoring remote control after the signalling work. 07
ATC entered service in June 2001
A Jernbaneverket announcement of 28 November 2001 recorded that automatic train stop had entered use between Hamar and Røros in June that year. On 28 November, remote control resumed between Hamar and Koppang. The announcement still described restoration between Koppang and Røros as a future stage. The June date concerns the train-stop system; the November date concerns remote control of part of the line. 08
The same announcement reported a new train-number system showing each train’s position, risk assessments for the change back to remote operation, international signalling expertise and an independent review group. It stated that the Railway Inspectorate had approved the resumption in a letter dated 26 November 2001. 08
Emergency GSM-R entered service in 2004
Reliable communication took longer. On 1 December 2004, Jernbaneverket brought GSM-R into service on Rørosbanen and several other lines that had lacked train radio. GSM-R is a railway-specific digital radio system. Initially, it provided emergency communication, giving drivers and controllers a reliable way to contact one another. This initial emergency service should not be confused with every later train-radio function being available from the same date. 09
The Railway Inspectorate required reliable emergency communication along the track and in tunnels. Lines that did not meet that requirement had operated under temporary exemptions. Jernbaneverket’s announcement recorded approval to start the new service on 1 December. 09
An independent railway investigation department opened in 2002
Åsta also led to a proposal for a permanent railway safety-investigation body. The existing civil-aviation investigation authority’s mandate was extended, and its railway department was formally established in 2002. The Norwegian Safety Investigation Authority explains that these investigations seek causes and preventive measures, independently of investigations into civil or criminal liability. 10
Sources for Åsta: collision and fire
25 years after Åsta: commemoration, 6 January 2025
NOU 2000:30 — Åsta-ulykken, 4. januar 2000
Innst. S. nr.327 (2000–2001): follow-up of the Åsta report
St.prp. nr.76 (2000–2001), chapter5: Åsta recommendations and criminal disposition
Question time, 17 January 2001, question9
Kjøreveien 4/2001: Forbedret — men forsinket fjernstyring
Question time, 9 May 2001, question11: installation, approval and entry into use
Press release, 28 November 2001: Fjernstyring av Rørosbanens signalanlegg, pp.11–12
Jernbaneverket tar i bruk nødkommunikasjon, 1 December 2004
Rail: why Norway has a permanent independent railway investigation authority
· Collision and fire
Lillestrøm: collision and propane fire
Railway histories: Hovedbanen
On 5 April 2000, a freight train carrying propane collided with a stationary freight train at Lillestrøm. Two tank wagons began leaking and the escaping gas caught fire. Around 2,000 people were evacuated. The tanks were emptied without the feared rupture and gas explosion. 01
The train could not stop at the red signal
The train from Alnabru approached Lillestrøm on a descending gradient. It could not stop at the red signal and struck the train ahead at approximately 62 km/h. The propane wagons were immediately behind the locomotive. Their position meant that the collision involved the gas tanks at the front of the train, making the consequences depend on both the train’s ability to stop and the tanks’ resistance to damage. 03
Neither driver nor anyone else was injured in the collision. 02
The commission found insufficient air pressure
The commission concluded that the driver’s brake valve had been left in its intermediate position. In this position, the air supply was not replenished, and gradual leakage could empty the brake system without applying the brakes. The driver disputed having left the valve there. A stationary brake test had been completed at Alnabru, but the required running brake checks were not made before the descent. The commission found that a running check would have exposed the problem in time to restore the air supply. 02
The train also had less braking capacity than its documentation stated. The inquiry identified inadequate verification of actual brake performance, weaknesses in maintenance and training, and the absence of an alarm or device preventing the locomotive from pulling the train when brake-pipe pressure was critically low. It could not establish whether the deficient brakes were themselves necessary for the collision, but concluded that they increased the impact speed. Projecting bolts on the tanks’ access covers caught each other in the collision and caused the leaks. 02
Crews cooled the tanks and emptied the gas
Fire crews established water cooling while allowing the leaking gas to continue burning, to avoid a release of unburned propane that could ignite elsewhere. The evacuation zone was enlarged to about one kilometre. Reinforcements came from fire services and the Civil Defence. Maintaining the cooling required water supplies; changes in wind, pump interruptions and freezing hoses complicated the work. 01
Swedish gas specialists helped arrange controlled flaring: propane was led through hoses to burners so the tanks could be emptied. Damage to one wagon’s discharge equipment required a separate intervention to fit connections to the tank. The evacuated population was allowed back on Sunday 9 April. The response had required coordination between fire and rescue services, police, gas specialists and supporting organisations over several days. 01
Safer tanks and dangerous-goods transport
The recommendations extended beyond the driver’s actions. They also considered how tank design, train formation and measures for populated areas could reduce the consequences of a collision. 05
Proposed ways of reducing the consequences of a collision included smoother tank ends, reconsidering where dangerous-goods wagons were placed, and assessing the use of intervening wagons without dangerous goods. Speed and timing restrictions, together with route-specific risk assessments through built-up areas, were also considered. 05
Prevention and training changed after the fire
In the 2001–2002 civil-protection white paper, the government reported that NSB Gods, Jernbaneverket and the gas suppliers had reviewed the transport arrangements and that extensive preventive measures had been initiated. The national fire-safety authority was also following up the findings through work in Norway and international forums governing dangerous-goods transport. The white paper stressed municipal crisis plans and the ability to reinforce a local fire service rapidly. 03
The later review in NOU 2012:8 recorded a concrete consequence for training: dangerous goods received greater attention at the Norwegian Fire Academy after Lillestrøm. It also described why access to specialist knowledge and the existing intermunicipal fire service had mattered during the response. The commission had recommended a training programme developed jointly by the authorities and the liquefied petroleum gas industry, so that responders could assess tank failures, cooling and evacuation more effectively. 04
Lillestrøm informed later risk assessments
Jernbaneverket’s 2015 freight analysis for KVU Oslo-Navet returned to Lillestrøm when assessing dangerous goods through densely populated areas. It retained local risk analysis as a relevant consideration when choosing routes and protective measures. The accident therefore remained part of the evidence used in later planning discussions, alongside the technical and organisational work that followed the collision itself. 05
Sources for Lillestrøm: collision and propane fire
Propanbrannen på Lillestrøm stasjon
NOU 2001:9 — Lillestrøm-ulykken 5. april 2000
St.meld. nr. 17 (2001–2002) — Samfunnssikkerhet, section 6.17.4
NOU 2012:8 — Ny utdanning for nye utfordringer, review of major incidents
KVU Oslo-Navet — Godstrafikk på jernbane (7 July 2015), pages 14–15
2010
· Runaway vehicle
Sjursøya: runaway freight wagons
Railway histories: Godstogsporet Loenga–Alnabru
On 24 March 2010, sixteen empty freight wagons ran uncontrolled from Alnabru towards Oslo’s harbour. The wagons had no locomotive attached. Part of the formation derailed on the approach to Sydhavna, while the leading wagons continued into the container-terminal entrance building and towards the water. Three people were killed and four were injured. 01
Alnabru’s use had changed
Alnabru combined a sorting yard with a container terminal. A shunting locomotive moves wagons between tracks, couples them together and positions them for loading or storage. The yard’s arrival tracks lay on a gradient so wagons could be released under control for sorting. Track-mounted brakes held formations in place. Over time, freight changed from individual wagonloads towards container trains, and arrival tracks were also used to hold empty formations between terminal tasks. The wagons involved had been unloaded during the night and parked for reloading later that day. Shortly before the accident, an additional wagon was coupled into the formation. 01
Staff misunderstood which vehicles would move
The local traffic controller understood that the formation was to be moved for loading and released the track-mounted holding brake. The shunting supervisor intended to move only the shunting locomotive, which had been uncoupled. The two therefore acted on different understandings of the requested movement. The final inquiry found no standard wording or required repetition of messages to expose this misunderstanding. Two potentially protective provisions were not known or used by the staff involved. 02
Once the wagons had reached track G4, there was no available diversion that could stop them before they left Alnabru. The inquiry also identified deeper weaknesses: changing use of the yard had not been matched by adequate development, and Jernbaneverket and CargoNet did not handle safety-critical information systematically. Incident reporting, risk assessments and communication between organisational levels were deficient. The report issued seven recommendations covering physical barriers, risk analysis, coordinated safety management, reporting, communication and the understanding of governing documents. 02
The wagons continued into the harbour
The wagons continued through Bryn and Loenga. A derailment device at the south end of Loenga’s track 10 was broken through. At Kongshavn, a wagon derailed and pulled the vehicles behind it off the track. Seven leading wagons continued. One person beside the track was killed; two more died in the terminal entrance building. The emergency response had to cover two accident sites. Railway control alerted the fire-service control room while the wagons were still moving; ambulance, police and fire units then responded to the harbour. 03
Safety work began before the final report
The government’s 2011 transport-budget proposal, prepared in 2010, described the Railway Authority’s follow-up of the preliminary recommendations with Jernbaneverket and the operators using Alnabru. It reported that the infrastructure manager and operators had already taken several measures to prevent a similar occurrence. This was an early response to the accident, before the final investigation report was published in March 2011. 04
New barriers did not resolve every weakness
A new diverting turnout at Alnabru South entered use on 7 November 2010. Its normal position directed vehicles towards a buffer stop and sand basin instead of the outgoing freight line. 02
A later investigation, published in January 2014, documented a diverting turnout and a pit at the southern end of Alnabru, together with eight points that automatically returned to their protective position after a route was released. These were physical changes made after the 2010 accident. They provided a means of directing uncontrolled vehicles away from the outgoing line. 05
The same report reproduced the Railway Authority’s 2013 inspection findings. Important measures had been completed, but overall safety management at Alnabru was still deficient. Long-standing failures in track detection had not been repaired, and responsibilities between the organisations were not adequately clear. Some affected tracks were owned by Rom Eiendom, leased by CargoNet and controlled by Jernbaneverket. The existence of a new protective installation therefore did not mean that all the organisational problems identified after Sjursøya had been resolved. 05
Safety measures reduced terminal capacity
The 2020 concept study for freight terminals in the Oslofjord region recorded that Alnabru’s handling capacity had been reduced by safety measures introduced after Sjursøya. The changes affected the way freight could be handled as well as the protection against uncontrolled movements. At that stage, the study included later signalling renewal and further terminal investment in its reference assumptions. 06
Sources for Sjursøya: runaway freight wagons
Foreløpig rapport med umiddelbar sikkerhetstilråding — Alnabru–Sydhavna (3 May 2010)
Report 2011/03 — Freight car set that rolled uncontrolledly from Alnabru to Sydhavna on 24 March 2010
NOU 2012:8 — Ny utdanning for nye utfordringer, review of major incidents
Prop. 1 S (2010–2011) — Transporttryggleik på jernbaneområdet
Railway report 2014/01 — Alnabru collision on 9 January 2013, section 2.5
KVU Godsterminalstruktur i Oslofjordområdet (2020)
2011
· Fire
Hallingskeid: fire in a snow shed
Railway histories: Bergensbanen
On 16 June 2011, express train 62 entered Hallingskeid station while the eastern snow shed was burning. The passengers were evacuated without injury, but the train and much of the railway equipment were destroyed. 03
The wooden shed allowed the fire to spread
Most of the snow shed was wooden, with a short concrete section. The damage showed the difference this made. A carriage protected by the concrete section suffered mainly soot and smoke damage. Fire did not spread through its interior to the next part of the train. Instead, the external fire spread around the concrete section and reached the rear portion. The shed surrounding the train was therefore central to the extent of the damage. 03
Passengers evacuated; firefighting equipment delayed
The train lost traction power as it approached the fire. It stopped but could not reverse out. The 257 passengers were evacuated. Reaching Hallingskeid with firefighting equipment took considerably longer: heavy equipment arrived more than six hours after the fire began. 01
Jernbaneverket prioritised the available rail vehicles for passenger evacuation. This left no capacity to transport firefighters and equipment at the same time. The investigation identified access to vehicles and qualified railway personnel as a weakness in the emergency arrangements. 01
Hot work identified as the probable cause
Rail welding had taken place that morning in the area where the fire was thought to have started. SINTEF examined the site, observed welding and carried out ignition tests using wood from the snow sheds. Its assessment considered sparks, glowing particles and electrical faults. It regarded a fire originating in the train as very unlikely on the witness and photographic evidence, but did not exclude every alternative ignition source. 02
The final safety investigation found no directly demonstrable cause. It considered hot work the probable trigger and identified weaknesses in job-risk assessment and checks after the work. That conclusion remains a probability, rather than proof of the precise ignition sequence. 01
Longer checks after hot work
Immediate measures addressed hot work. In July 2011, Jernbaneverket required checks for at least three hours afterwards. The inquiry also recommended a review of fire protection in existing snow sheds and stronger coordination by the Directorate for Civil Protection. The sheds had fallen outside the attention given to tunnels and designated special fire-risk premises. 01
Joint emergency planning was delayed
In a written parliamentary answer on 1 February 2013, Transport Minister Marit Arnstad set out the follow-up. The report had been sent to the Ministry of Justice on 18 June 2012 and forwarded to the Directorate for Civil Protection on 23 July. The directorate then asked Jernbaneverket to continue work on a joint project group for mountain-railway emergencies. Establishing the group had been delayed. Meetings had nevertheless taken place in December 2012, including discussion of emergency communications in railway tunnels. The coordination work was still in progress in early 2013. 04
During the parliamentary question session on 23 January 2013, the Minister also described the preparedness arrangements, including equipment for passengers during power failures and additional generators at mountain stations. Emergency preparedness was a focus of the Railway Authority’s 2013 inspection programme. The response to Hallingskeid concerned both preventing another shed fire and getting help to a railway location far from ordinary road access. 05
Sources for Hallingskeid: fire in a snow shed
Railway report 2012/05: Hallingskeid, train 62
Brann i snøoverbygg på Hallingskeid, NBL A12120, 1 June 2012
Tunnelsikkerhet: Hallingskeid fire and the damage to the train
Written question 709, answered 1 February 2013, document 15:5, p.108
Question session, 23 January 2013, question 10
2012
· Derailment
Nykirke: derailment during test running
Railway histories: Vestfoldbanen
On 15 February 2012, a Type 74 train derailed at Nykirke during testing. Five people were aboard. One was seriously injured and three suffered minor injuries. 01
NSB suspended testing after the derailment
The FLIRT trains were part of NSB’s renewal of its passenger fleet. Its annual report describes an initial order of fifty sets, with Type 74 for regional services and Type 75 for longer local journeys. Following Nykirke, testing was suspended for a period, then resumed. The first scheduled passenger departure with the new train type ran from Oslo S to Skien on 2 May 2012. 02
NSB’s own presentation to the Railway Authority’s 2012 safety seminar described the work behind introducing the trains: technical risk assessment, validation, maintenance documentation, driver training and operating procedures. The presentation’s post-accident lessons included involving the regular operating organisation and establishing safety management early in the project. It identified testing and introduction into service as activities requiring particular attention to responsibilities. The company stressed that safety responsibilities had to remain clear when a procurement project moved into regular operation. 03
Braking started too late for the curve
The journey combined testing of the passenger-information system with driver training. The driver overlooked advance notice of a reduction from 130 to 70 km/h and braked too late, at about 135 km/h. All five carriages derailed and struck the rock face. Investigators considered possible distractions but could not establish one as the explanation for the missed sign. They found no defect in the train that caused the derailment. 01
The distinction between partial and full automatic train control matters here. Partial ATC did not continuously supervise every change in line speed. Full ATC monitored the route’s speed variations as well as signal information. Having an ATC-equipped train therefore did not mean that every curve was protected against excessive speed. 04
The emergency call went to the wrong district
Vestfold’s fire service recorded a separate problem in the response. The traffic controller in Drammen called the emergency number, but reached the police district responsible for Drammen. The transfer to Vestfold did not produce an immediate answer. The fire service’s account put the resulting delay before the emergency services were alerted at fifteen minutes. Locating the train also took time: the initial message named a thirteen-kilometre stretch between Nykirke and Holmestrand. A Jernbaneverket employee subsequently guided the nearest fire crews to the site. 05
The fire service reported changes to the local arrangements after the accident. Drammen traffic control would notify the fire emergency centre directly, and both sides would use the same maps to identify railway kilometre points and access roads. 05
NSB reviewed testing procedures
NSB reported reviews of route knowledge, cab access, staffing and responsibility during tests. New Driver Regulations already required better checks on route competence; the inquiry did not present them as a consequence of this accident. Its safety recommendation instead called for identifying hazardous large speed reductions and introducing sufficient protective barriers where full speed supervision was absent. 01
Sources for Nykirke: derailment during test running
Railway report 2013/02: derailment near Nykirke, train 12926
NSB Group annual report 2012
Sikkerhetsstyring i prosjekter – NSB FLIRT, Tom Ingulstad, safety seminar 2012
Hastighetsovervåkning: partial and full ATC
Firsthand emergency-response account, 18 March 2012
2022
· Runaway vehicle
Alnabru: runaway locomotive
Railway histories: Alnabanen · Godstogsporet Loenga–Alnabru
On 23 October 2022, a parked Green Cargo locomotive rolled inside Alnabru freight terminal. No one was injured and no vehicle was damaged. 01
The parking brake could not hold the locomotive
T44-275 had stood for nearly twelve hours on a gradient of nineteen per thousand with its engine stopped. The driver had applied the air brakes and parking brake. Air gradually leaked away, releasing the air brake; the parking brake could not hold the locomotive on its own. No test had established that it could. At 00:55 the traffic controller saw it rolling towards the container terminal. It stopped about 170 metres from a buffer stop. It could not have entered the main line. 01
Parking practices and coordination were inadequate
The inquiry identified established parking practice on the slope, the longer stay, the absence of a holding test and inadequate coordination of health and safety between terminal users. Bane NOR subsequently took the coordinating principal-undertaking role. The report issued no safety recommendations, noting the end of Green Cargo’s Norwegian operation and the coordination change. 01
Bane NOR took on workplace safety coordination
Several businesses work within Alnabru. Bane NOR’s terminal handbook explains that one undertaking coordinates their health-and-safety work, while each business retains responsibility for its own employees and activities. Coordination includes sharing information about work that affects others, joint risk assessments, inspections and arrangements for reporting deficiencies. Naming a coordinating undertaking therefore assigns work across the boundaries between employers; it does not transfer every employer’s responsibility to that undertaking. 02
The handbook’s May 2024 list identifies Bane NOR as principal undertaking at Alnabru. This confirms the allocation recorded after the incident. It does not demonstrate that every parking weakness identified by the inquiry had been resolved. 02
Sources for Alnabru: runaway locomotive
Rail report 2023/05: runaway locomotive at Alnabru, 23 October 2022
Terminal handbook: coordination of health and safety, including May 2024 terminal list
2024
· Derailment
Arna: freight train derailment
Railway histories: Bergensbanen
On 22 March 2024, an OnRail freight train derailed at Arna station. The driver suffered minor injuries. Damage to the train and infrastructure was estimated at nearly NOK 80 million. 02
The wagon brakes were isolated before departure
At Bergen terminal, a non-safety-critical fault affected the BR187 locomotive’s TDD display. To restart the locomotive, the brake-pipe cocks between it and the first wagon were closed. Only the locomotive’s brakes could then be applied. The fault was recurrent, with no troubleshooting procedure. The work was unplanned and interrupted by a call from traffic control asking whether departure could be brought forward. OnRail had not assessed the risks of introducing this locomotive type. 02
Closing them was intended to keep the wagon brake pipe pressurised. Neither the driver nor the terminal worker reopened the cocks before departure, and no brake-pipe continuity test followed. 01
The running brake test did not reveal the fault
The driver did test the brakes in Ulriken Tunnel. The test was made uphill, and the driver judged the braking normal. The missing wagon braking went undetected. 02
The diverting turnout worked as intended
Train 5924 passed a stop signal at about 75 km/h. A diverting turnout led it away from the main track. It hit a buffer stop and derailed beside the tunnel entrance. Automatic protection had already demanded braking, but the isolated wagon brakes could not respond. 01
SHK found that the signalling and track equipment had worked as intended. 02
Over five hours before passengers could leave the train
Misunderstandings between controllers and emergency services delayed help for roughly 170 people in a passenger train. 02
Over five hours passed before passengers could leave the train at Stanghelle. 01
The line reopened on 2 April
Track, overhead wiring and signalling equipment were damaged. Crews first lifted away containers and wagons outside the tunnel before recovering the vehicles inside. Undamaged wagons went back to Bergen. The overhead line and a mast also had to be removed during the recovery. 03
Bane NOR cleared the site through Easter and reopened the line on 2 April. 04
On 25 March, PostNord warned customers of freight delays and said no reopening date was known. It confirmed the reopening on 2 April, but warned that knock-on delays could continue during the week. 05
Road freight received a temporary exemption
From 26 March to 5 April 2024, the Norwegian Public Roads Administration temporarily relaxed driving-time limits for east–west road freight directly affected by the railway closure. 06
OnRail had not reported completed measures
By October 2025, OnRail had not reported implemented measures. Bane NOR reported work completed, ongoing or planned: parallel recovery and evacuation planning, earlier emergency-service notification and clearer communication of disabled-train procedures. Coordination work remained unfinished. 01
Three safety recommendations followed
SHK recommended risk assessment of BR187 use at OnRail, joint emergency exercises for Bane NOR, and checks that Norwegian BR187 users followed the manufacturer’s braking conditions. Those conditions also covered ETCS brake tests, requiring wagons to be disconnected or their brake-pipe connection closed. 01
The driver accepted a fine in 2026
On 8 May 2026, Bergens Tidende reported that the driver had accepted a NOK 30,000 penalty notice for negligently creating a danger to the public. The newspaper quoted the police and interviewed the prosecutor. The case against the employee who helped prepare the train had been dropped because of insufficient evidence. 07
Sources for Arna: freight train derailment
Bane report 2025/03: Arna, 22 March 2024; final report published 14 October 2025
Rapport om jernbaneulykken ved Arna stasjon: Godstoget kjørte med svært lite bremsekraft, 14 October 2025
Bergensbanen gjenåpnet 2. april, 2 April 2024
Annual report 2024, printed page 14: recovery and reopening after Arna
Operational notices, 25 March and 2 April 2024: closure and reopening of Bergensbanen
Unntak fra kjøre- og hviletid etter Arna-avsporingen, 26 March 2024
Siktet lokfører har godtatt bot etter ulykken i Arna, 8 May 2026
· Derailment
Finneidfjord: derailment after a rockslide
Railway histories: Nordlandsbanen
On 24 October 2024, train 471 struck a rockslide at Finneidfjord, north of Bjerka. The locomotive and the first two carriages left the railway embankment. The driver died and five passengers suffered minor injuries. 01
Rock had struck another train in 2016
On 3 October 2016, train 474 had also struck fallen rock near Bjerka. Fourteen passengers were aboard, and two suffered minor injuries. The slope had been inspected and protected. Bolted blocks remained in place, but other material fell into a catch ditch and some reached the track. The inquiry considered heavy rainfall a possible trigger. Its 2017 recommendation called for procedures and methods that would detect changes in slope stability as weather and climate conditions changed. The history of the area therefore already included an investigated failure of protection intended to keep rock off the railway. 02
The slide was not detected before the train arrived
The 2024 train approached at the line speed of about 90 km/h and slowed to about 60 before impact. The slide had remained undetected. A blocked passage and the absence of communication equipment prevented the chief conductor and café attendant from communicating during the response. 01
The inquiry found failings in protection and risk assessment
The 2026 inquiry identified prolonged rainfall, inadequate previous rock protection and weaknesses in the use of risk information. Protective work had not been assessed under Eurocode 7, the geotechnical design standard. Other precautions had been removed without risk assessments. Available knowledge was not used sufficiently across local and central parts of Bane NOR. 01
The E6 reopened after the train was removed
The derailed train also blocked the E6 corridor. On 5 November 2024, the Norwegian Public Roads Administration announced that the road would reopen the following morning after recovery of the train had been completed. Clearing and securing the terrain still required work, with shorter closures expected during that period. Recovery of the vehicles and securing the damaged slope were separate tasks, and reopening the road did not establish that the railway was ready for traffic. 04
Rockfall warning and further protection were installed
Bane NOR’s response of 27 May 2026 records measures already completed at the site. Loose material and the rock cutting had been cleared, further rock protection installed, and new inspection and follow-up routines introduced. Engineering-geological assessments and laser scanning were used to improve the understanding of stability. A rockfall-warning system was installed and the speed on the affected section reduced to 60 km/h. 03
Bane NOR also acknowledged weaknesses in internal cooperation. It reported that an April 2025 reorganisation had centralised safety resources to improve the sharing of expertise and coordination, alongside measures to strengthen management follow-up. These are the infrastructure owner’s reported actions. They are distinct from the final report’s recommendations on wider organisational practice. 03
Three recommendations on safety management and design
The three recommendations concerned sharing internal knowledge, strengthening safety-management competence in management and administrative roles, and clarifying when Eurocode 7 must be applied. 01
SJ suspended night trains because of a locomotive shortage
The effects continued after the line could reopen. In its release of 19 November 2024, SJ Norge announced that it would prioritise daytime services and suspend the Nordlandsbanen night trains without replacement transport. The operator attributed the shortage of locomotives to the accident and the frequent, extensive maintenance needed by the remaining older Di 4 locomotives. It was working with the Railway Directorate and Norske Tog on an interim solution. 05